Loading...
HomeMy WebLinkAbout0124340-Building o OSHKOSH ON THE WATER Job Address 146 ALGOMA BLVD CITY OF OSHKOSH No 124340 BUILDING PERMIT - APPLICATION AND RECORD Owner 146 ALGOMA BLVD LLC Create Date 04/20/2007 Designer Contractor OWNER Category 223 - Alteration Offices, Banks, Professional Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature Comm/ Suite "F"/ Yoga studio. Finishing off 1875 sq. ft of space on the 2nd floor per the state approved plans. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid Issued By: ~ $53.00 Park Dedication $0.00 Date 04/20/2007 FinaIlO.P. 00/00/0000 o Permit Voided I Parcelld # 0701230000 In the performance of this work 1 agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh fJas u itY to enforce easement restrictions of which it is not a party, if you perform the work described in this permit a Ii ion within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure' ssary provals before starting such activity. Date ,( C/.-~ O&( Signature Address 51051 AH MAYTAH RD Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.