HomeMy WebLinkAbout0124341-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 755 W 17TH AVE
CITY OF OSHKOSH No 124341
BUILDING PERMIT - APPLICATION AND RECORD
Owner AMY L TAPLIN Create Date 04/20/2007
Designer
Contractor OWNER
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq. Ft.
Sq. Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier . Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature SFRI Reroof House and detached garage. Tear off existing for house; reroof over existing single layer for garage. Reside house and
of Work arage. Tear off existing siding for house, reside over existing for garage.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
,800.00 Plan Approval
$0.00 Permit Fee Paid
$46.00 Park Dedication
$0.00
Issued By:
Date 04/20/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1405960300
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to s re any necessary approvals b fore starting such activity.
Signature
Date
4c2()-{)7
Address 755 W 17TH AVE
OSHKOSH
WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.