HomeMy WebLinkAbout0124314-Building (roof)
o
OSHKOSH
ON THE WATER
Job Address 1814 IOWA ST
CITY OF OSHKOSH No 124314
BUILDING PERMIT - APPLICATION AND RECORD
Owner RUDY MEYER Create Date 04/19/2007
Designer
Contractor MEISEL CONSTRUCTION
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Sq. Ft.
Sq. Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Unfinished/Basement
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature SFRI Late Permit -Tear off roofing, install new decking, felt, flashing, vents and shingles - No Structural Work
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
, 0.00 Plan Approval
$0.00 Permit Fee Paid
$60.00 Park Dedication
$0.00
Issued By:
Date 04/19/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1405090000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary appr Is before starting such activity.
1# --
Date
tj ~/ 9~o7
Signature
Address 963 EVANS ST
Agent/Owner
NEENAH
WI 54956 - 3916
Telephone Number
(920) 292-0862
. To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.