Loading...
HomeMy WebLinkAbout0124313-Building (shed) e OSHKOSH ON THE WATER Job Address 844 FREDERICK ST CITY OF OSHKOSH No 124313 BUILDING PERMIT - APPLICATION AND RECORD Owner JOSEPH J SCHINKE Create Date 04/19/2007 Designer Contractor OWNER Category 151 - New Utility Buildings-Sheds (Residential) Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I FinishedlLiving Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRI Renew existing permit (116716) acc structure exterior remodel" of Work HV AC Contractor Plumbing Contractor Electric Contractor $3,200.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 04/19/2007 FinallO.P. 00/00/0000 D Permit Voided I Parcelld # 1005730000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu re.,~,})Y nece.ssa'?'...;~7.roval before starting such activity. v . ~ ~~~_~ Signature '" ;::;.-: ~~ Date ~v r {{ -v T r~-~~ , /'// Agent/Owner .1::: Address 844 FREDERICK ST OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.