Loading...
HomeMy WebLinkAbout0124321-Building (ramp) ....,' . OSHKOSH ON THE WATER CITY OF OSHKOSH No 124321 BUILDING PERMIT.. APPLICATION AND RECORD Owner JOHN F GALlCA Create Date 04/19/2007 Job Address 2206 ASHLAND ST Designer Contractor OWNER Category 142 - Decks, Patios, Ramps Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier .0 Treated Wood o Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRllnstalling a handicap ramp along the side of the house. The ramp will not exceed a 1 to 8 slope. Code compliant handrails and of Work ;Juardrails are required. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Val!i] Issued By:L- $1,000.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 04/19/2007 FinaIlO.P. 00/00/0000 o Permit Voided I Parcelld # 1516280000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t ,.' cure any necessary approvals}1e ore sta~ng such activity. t7' 7 . _J. {~7/~ Signature;'1 . { _ aut{, Date '>C) Agent/Owner ( Address 2206 ASHLAND ST OSHKOSH WI 54901 - 1904 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.