HomeMy WebLinkAbout0124321-Building (ramp)
....,'
.
OSHKOSH
ON THE WATER
CITY OF OSHKOSH No 124321
BUILDING PERMIT.. APPLICATION AND RECORD
Owner JOHN F GALlCA Create Date 04/19/2007
Job Address 2206 ASHLAND ST
Designer
Contractor OWNER
Category
142 - Decks, Patios, Ramps Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
.0 Treated Wood
o Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFRllnstalling a handicap ramp along the side of the house. The ramp will not exceed a 1 to 8 slope. Code compliant handrails and
of Work ;Juardrails are required.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Val!i]
Issued By:L-
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
Date 04/19/2007
FinaIlO.P. 00/00/0000
o Permit Voided I
Parcelld # 1516280000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and t ,.' cure any necessary approvals}1e ore sta~ng such activity. t7' 7
. _J. {~7/~
Signature;'1 . { _ aut{, Date '>C)
Agent/Owner (
Address 2206 ASHLAND ST
OSHKOSH
WI 54901 - 1904
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.