Loading...
HomeMy WebLinkAbout0124239-Plumbing (water heater) G OSHKOSH ON THE WATER Job Address 1260 CUMBERLAND TRL CITY OF OSHKOSH No 124239 PLUMBING PERMIT - APPLICATION AND RECORD Owner 12601374 MARICOPA DRIVE LLC Create Date 04/16/2007 Category 411 - Residential-Water Heaters Plan Contractor MOREMAN PLBG & HTG SERVICE INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Shower Floor Drain Lndry Tray . Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve .... .....,....".., ~i EyeWash Statn Beer Tap Hand Sink Urinal Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Replace gas water heater at 1374 Maricopa Dr. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1314980000 $600.00 Plan Approval $0.00 Permit Fees $25.00 D Permit Voided I Date 04/16/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 1325 OSHKOSH WI 54903 - 0000 Telephone Number 231-9191 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.