HomeMy WebLinkAbout0124271-Building (alterations)
o
OSHKOSH
ON THE WATER
Job Address 333 W 29TH AVE
CITY OF OSHKOSH No 124271
BUILDING PERMIT - APPLICATION AND RECORD
Owner OSHKOSH TRUCK CORP Create Date 04/17/2007
Designer
Tom Karrels
Contractor CARDINAL CONSTRUCTION CO INC
Category
211 - Alteration Industrial
Plan X8-1948-0407
Type
. Building-
o Sign
o Canopy o Fence o Raze
Class of Const: 2Bibc Size no change
Rooms Height Ft. D Projection I
-
Bedrooms Stories Canopies
-
Baths Signs
Zoning
Unfinished/Basement
Sq.Ft.
FinishedfLiving
Sq.Ft.
Garage Sq. Ft.
Foundation o Poured Concrete 0 Floating Slab o Pier . Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
UsefNature Factory/ Alterations to east mezzanine, gut and remodel into offices/cubicles.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuat
$19,700.00 Plan Approval
$0.00 Permit Fee Paid
$148.00 Park Dedication
$0.00
Issued By:
Date 04/17/2007
FinaIfO.P. 00/00/0000
D Permit Voided I
Parcelld # 1413490000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
~.~
-} Agent/Owner
Address BOX 0564 FOND DU LAC
Signature
Date
'-f -'/ 7-07
WI 54936 - 0564
Telephone Number
920-922-4446
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.