Loading...
HomeMy WebLinkAbout0124271-Building (alterations) o OSHKOSH ON THE WATER Job Address 333 W 29TH AVE CITY OF OSHKOSH No 124271 BUILDING PERMIT - APPLICATION AND RECORD Owner OSHKOSH TRUCK CORP Create Date 04/17/2007 Designer Tom Karrels Contractor CARDINAL CONSTRUCTION CO INC Category 211 - Alteration Industrial Plan X8-1948-0407 Type . Building- o Sign o Canopy o Fence o Raze Class of Const: 2Bibc Size no change Rooms Height Ft. D Projection I - Bedrooms Stories Canopies - Baths Signs Zoning Unfinished/Basement Sq.Ft. FinishedfLiving Sq.Ft. Garage Sq. Ft. Foundation o Poured Concrete 0 Floating Slab o Pier . Other o Concrete Block o Post o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 UsefNature Factory/ Alterations to east mezzanine, gut and remodel into offices/cubicles. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuat $19,700.00 Plan Approval $0.00 Permit Fee Paid $148.00 Park Dedication $0.00 Issued By: Date 04/17/2007 FinaIfO.P. 00/00/0000 D Permit Voided I Parcelld # 1413490000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. ~.~ -} Agent/Owner Address BOX 0564 FOND DU LAC Signature Date '-f -'/ 7-07 WI 54936 - 0564 Telephone Number 920-922-4446 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.