April 5, 2007
Mr. David Buck Street
Planning Services
Oshkosh, VVI54901
RE: Arthur Pommerening Bridge
Dear Sir:
After consultation with the Fire Chief, here are the specification requirements for
the Arthur Pommerening Bridge and fire lane.
Bridge: VVidth of 19 feet with 1 foot railing setback to bring the clear width to
20 feet is acceptable
Weight carrying ability of 75,000 pounds is required by the
International Fire Code (IFe)
Fire Lane: A width of 20 feet is required by IFC
Weight carrying ability of 75,000 pounds is required by the
International Fire Code (iFC) .
The fire lane must be paved asphalt or concrete (IFC)
A turnaround is required at the end of the fire lane
120 foot Hammerhead, 60 foot "yn or a 96-foot diameter cul-de-
sac in accordance with table 0103.4 IFC 2003 appendix 0
Road grade not to exceed 10% without approval by the Fire Chief
Bridge and fire lane shall be above the 50-year high water level
Fire lane requirements shall comply with IFe 2003, appendix D
If there are any questions, please call.
Sincerely,
S~ ~G~
Stuart Schrottky
"~
APPENDIX 0
.FIRE APPARATUS ACCESS ROADS
,
The provisions contained in this appendix are hot mandatory unless specifically referenced in the adopting ordinance;
SECTION 0101
GENERAL
DIOl.l Scope. Fire apparatus access roads shall be in accor-
dance with this appendix and all other applicable requirements
of the International Fire Code.
SECTION 0102
REQUIRED ACCESS
DI02.1Access and loading. Facilities, buildings or portions
of buildings hereafter constructed shall be accessible to fire
department apparatus by way of an approved fIre apparatus
access road with an asphalt, concrete or other approved driving
surface capable of supporting the imposed load of fire appara-
tus weighing at least 75,000 pounds (34 050 kg).
SECTION 0103
MINIMUM SPECIFICATIONS
DI03.1 Access road width with a. hydrant. Where a fire
hydrant is located on a fire apparatus access road, the minimum
road width shall be 26 feet (7925 rom). See Figure D103.1.
DI03.2 Grade. Fire apparatus access roads shall not exceed 10
percent in grade.
Exception: Grades steeper than 10 percent as approved by
the fire chief.
DI03.3 Turning radius. The minimum turning radius shall be
determined by the fire code official.
DI03.4 Dead ends. Dead-end fIre apparatus access roads in
excess of 150 feet (45720 rom) shall be provided with width
and turnaround provisions in accordance with Table D103.4.
TABLE 0103.4
REQUIREMENTS FOR DEAD-END FIRE
APPARATUS ACCESS ROADS
LENGTH WIDTH
(feet) (feet) TURNAROUNDS REQUIRED
0-150 20 None required
120-foot Hammerhead, 60-foot "Y" or
151-500 20 96-foot-diameter cul-de-sac in
accordance with Figure D103.1
120-foot Hammerhead, 60-foot "Y" or
501-750 26 96-foot-diameter cul-de-sac in
accordance with Figure D103.1
Over 750 Special approval required
For SI: 1 foot = 304.8 mm.
DI03.5 Fire apparatus access road gates. Gates securing the
fire apparatus access roads shall comply with all of the follow-
ing criteria:
1. The minimum gate width shall be 20 feet (6096 rom).
20'
2S'
9S' DIAMETER
CUL-DE-SAC
SO'1 T tto'
1[: 20'.3
2S'R
TYP:
-... 2S'
120' HAMMERHEAD
For SI: 1 foot = 304.8 rom.
2S'
..
SO"V'
MINIMUM CLEARANCE
AROUND A FIRE
HVDRANT
2S'R
TYP,'
l
20.3
20'
ACCEPTABLE ALTERNATIVE
TO 120' HAMMERHEAD
FIGURE D103.1
DEAD-END FIRE APPARATUS ACCESS ROAD TURNAROUND
2006 INTERNATIONAL FIRE CODE@
397
,
~~
~AiI;S:L..
~NG
. ..~---------~
r
\ \
\ APR 1 3 2007 \
~~\jITY DEVcLCPr/ENT \
April 12, 2007
David Buck
City of Oshkosh
215 Church Avenue
PO Box 1130
Oshkosh, WI 54903-1130
Re: Pommerening Bridge - Sawyer Creek, City of Oshkosh
Dear David Buck:
As you are aware, we have completed the hydraulics review of Art Pommerening's expanded bridge
with the DNR. I have enclosed a copy of the re-submittal to FEMA in regard to the CLOMA for the
construction of the bridge.
In addition, I have reviewed the existing construction and the drawings provided by the owner for the
additional deck width and have detennined the bridge to be capable of supporting a two axle truck <
weighing 75,000 lbs, to this I do certify.
If you have any questions or if additional information is required, please let me know.
Sincerely,
J~~~~
. President
JRD/mas
Enclosure (a/s)
Cc: Art Pommerening
7877 Racine Street. Menasha, W/54952. Ph. 920-997-7866 · Fax 920-830-9595 · www.dave/engineering.com
RPR-14-2007 13:36 FROM:POMMERENING DODGE JE 9202363102
TO: 92365053
Exhibit
P.2
or:
INGRESS/EG ESS EASEMENT
Located in part of Lot 1 of CSM4337, being part 0 the Northeast 1/4 of Section 21, Township 18 North,
Range 16 East, Town of Algo a, Winnebago County, Wisconsin.
Commencing at the Northeast comer of Section 21; Thence alon the East line of the Northeast quarter of said Section, SOO.02'23"E,
111,72 feet; Thence 589039'21 ''W, 33.71 feet to a point on the st rlght-<>f-way line of Washburn Street and being the point of beginning
of said PERMANENT LIMITED EASEMENT: Thence continuing 89039'21"W, 167,69 feet; Thence N6901S'32''W, 98.11 feet. more or less,
to the centerline of SawYer Creek; Thence S20041'40"W, 20,00 f et; Thence S69015'32"E, "92.82 feet; Thence N8903~'21;'E, 171,07 feet to
a point on the West right-of-way line of said street; Thence along aid line, NOo036'47"E, 20,00 feet to the point of beginning. Said
EASEMENT contains 5,207 SF (0.1195 Ac) of said GRANTOR'S I nd,
o 80
~
N89'~S'2"I.E
81.02'
Section 21.
T.18N.. R"6E.~
N89'3S'21"E
"5235'
160
I
IJ\
-5
go.
t..l~
("I.. Q:I:
Bearings are referenced to the East line of the
Northeast 1/4 of Section 21, T. 18 N., R. 16 E.
Lot 1
----
Certified
------
~~~~_~~E.
No. 4337
465.53'
N8S'39'21"E
~ Davel Engineering, Inc.
Civil Engineers and
Land Surveyors
~ '''' R....""..
'-'-_A!l'Z.. Menosha W1s~'Onsln
~NG Ph. 920-991-1866. Fax 920-830-9595 Survey for:
Ar:thur Pommerenlng
Apr 11. 2007 - 03:08 PM J:\Projacts\3060pom\dwg\3060eqse.dwg Printed y~ chris
R e c e i ve d T i me A p r. 14. 2: 41 PM
File:.3060ease.dwg
Dale: 04/11/2007
Drafted By: Chris
Sheet: EXHIBIT
I~
.....0
:: H~
~~
"ll~
m
S89'23'131E
1.50' :!:
~~
- - Cl
"'-M
~ f ~o,
t-- MCO
~g I lJ)
(') .
o 0
~~IQ) I
I (1) I
,b I
l; (J) I
g~ I
Oa:iC
"lb:L I
z.., l
Jip:J
;f:f /
::i:l:lC/) I
~~O I
IUjS j
I
I
I
;...
o
ai
OJ
'"
jU
....
....
'io
r>
o
o
z
37.~
, .
t. ,
CITY OF OSHKOSH - DEPT. OF COMMUNITY DEVELOPMENT
ZONING PERMIT REVIEW - TOWN OF ALGOMA
Location of Property: 459 N Washburn Street T. Of Ale:oma (Rear Portion of Strip Center Lot)
Date: 12/05/06
Applicant Name: Art Pommerening
Phone: 920-236-3100
Fax: 920-236-3102
Applicant Address: 237 N Washburn St,
City: Oshkosh
State: WI Zip: 54904
Owner: Arthur E Pommerening
Parcel Number(s): 06-1162-0000 Zoning: C-2ETZ
Type of Construction: new Bridge Constriction over Sawyer Creek
Compliance Checklist
Use
Lot \Vidth
Lot Depth
Lot Area
Floodplain
Affpert
!!eight
Front Setback
Corner Side Setback
Interior Side Setback
Rear Setback
Buildillf; .^..rea
Access Regulations
Parking Standards
Loading Standards
Vision Clearance
Trans. Yard Standards
Screening
Landscaping
Lighting
Signagc
Mechanical Scr-eening
Var.lCUPIPD Conditions
Other
Comments/Conditions
Attached find review from Fire regarding acceptable bridge design.
Attached find review from DNR regarding floodway compliance.
Attached find Ingress/Egress easement.
NOTE: No building permit is issued for the bridge construction-thls is
zoning, floodplain and fire compliance only.
Review Fee: $0.00
I:&lApproved
DApproved w/Conditions
o Denied
o Hold
Reviewed by: David Buck Review Date: 04/16/07
Please contact the Zoning Administrator at 920.236.5057 if you have any questions.
REVIEW AUTHORITY
As per Section 30~S Enforcement of the City Zoning Ordinance, the Director ofCorrununity Development. or designee, must approve all plans, except the following: (I) Alterations or interior
work when the use is confonning and when no change in use is proposed. (2) Maintenance items. e.g_ siding, windows, etc.. when the use is conforming and when no change is proposed.
COpy:
Planning CitylnspecHoll Town of Algoma
Winnebago County
"1:;_ '
FLOODPLAIN BACKWATER STUDY - ADDENDUM
SAWYER CREEK
CITY OF OSHKOSH, WINNEBAGO, COUNTY, WI
For:
Art Pommerenina .
By:
Davel Engineering, Inc.
1811 Racine Street, Menasha, WI 54952
~"\""III'",,,,1.
. ~~"~ SCON8, 'I",,,,
,~'\ .......... ~.A~~
# .... ~~V ,
/~/..JOH . \~\
=: _ D~' \ ~
= :~I 12 : ::
- , .-
i \ . ASHA J lEi
'c:; WIS. "41;::
~ . ... k/;:
il'l....... .. ~ ~
. ~~ \9 ..__......."'~'l
'11,8: IOIA \.f~\\'\~
'1111111I III'" l~ ~
~ pjb f .
Con ents
General Description and Property Location
Study Methodology
Conclusions
Attachments
· Proposed Bridge Details
. Floodway Data Table
· Floodplain Map
· HEC-RAS Profile Reports .
. HEC-RAS model (Transmitted via Email)
~~~. .)~E fJ.
c., "~
U') ~,\
\t,. ~
~
General Description and Property Location
The property is located west of S. Washburn Street, and south of STH "21" in the NEX anclSE X of Section
21, Township 18 North, Range 16 East, in the City of Oshkosh. The land is owner Art Pommerening. The
main channel of the stream reach is a natural channel. The land is open fields with some brush and trees
west of the stream and lawn and buildings east of the stream.
Mr. Pommerening has applied for a permit to construct a bridge crossing of Sawyer Creek to access his land.
He has received the permit and constructed the bridge accordingly. To meet City fire code requirements, the
bridge must provide an unobstructed width of 20 feet wide instead of 10 feet. This analysis is simply a
revision to the previously approved model, which changes the bripge deck width to 19 feet.
Study Methodology
Hvdraulic Calculations
The previous study was modeled using the Army Cops of Engineers HES-RAS river modeling software.' This
approved model was modified to account for the proposed.20 wide deck on the revised proposal.
Specifically the deck width variable was changed from 10 to 20, the upstream cross section distance to the
first cross section upstream of the bridge was changed from 12 feet to 22 feet and the cross section distance
from the first section upstream to the second section upstream was changed from 100 feet to 90 feet. No
other changes were made to the model.
Water surface elevations from the revised proposed run are compared to the base run to determine
backwater. Although there is a small amount of backwater immediately upstream of the bridge, the
backwater attenuates in a short distance upstream, all within Mr. Pommerening's property limits. The cross
sections that are within the Pommerening property start with Section 28.2 and Section 29 is the last cross
section going upstream that is still within Mr. Pommerening's property.
The results are summarized in a table format. The HEC-RAS profile summary tables and cross sections also
follow and the HEC'-RAS model is available upon requested and can be transmitted via Email.
Conclusions
The flood plain elevations presented by this study are suitable for the purpose of comparing the relative
backwater created by the revised bridge structure. The model created for this study may be an effective tool
in predicting the impacts of construction of the proposed stream crossings. The results of this analysis
indicate the regional flood will not be adversely affected by construction of this crossing.
Sawyer Creek Bridge Expansion
City of Oshkosh, Winnebago County, WI
For: Art Pommerening
Profile Section BB
Approach Fill < l'
756.20
6" Thick Concrete Deck
20" High I-Beam
/TOP Of Deck Elevation = 757.16:t
1-15' Max ~
Toe of Approach
756.30
755.70
Existing
As halt
757.96
. ~..
"
Approach Fill < l'
755.39
,..
. .
:::.
30" Diameter Concrete
"Sonotube" Support
,-15'Max
Approach
42'
Clear Span
21'
Approach
~ Additional Excavation
Anchor Bolts
Cross Section View
20.0'
.' .'~: ~~ '.~ . :~
..
. ::~..-:: ~.:. :~ <"
, . . .. ....
....... ~..<4. ....:- .; '; 7;'
'. "/":'(.:"
, .
.~ ..<' ~.~ ' . '
J. ",) I...:....~.
.
....: '!-'.
; ~
Railing
3" I-Beam field welded every 4' oc
6" Thick Poured Concrete Deck
Existing Beam Guard
6" X 6" "\" Iron Side Frame
9.0'
Existing 10.0'
6" I-Beam Cross Brace every
4' on center Field Welded
Dashed Une Shows 6' X 6" llron
That Will Be Welded Across All
Three Beams. Anchor Bolts To
Attach To "I" Iron Cross Piece
. , .:.. ,~ ",'
:.~. .~.j.. ":.. .:..~....
..............
'.04. '.......
,':.1",'
',,::.. .::'!.'; ...... .....
.....:
.:'..
o
N
..... - ..
. ," .,' or':! :~
..:......
....,...
"";.' :";',
. .:....
j :. " ';, ~:. . .'
"~'. ;~>;J\~~.;
.:........
":/"'':'' ";~
. ~.~. ::: ::'" ~: ...
....~. .: "
'.~"~' . ~
..... ... 1.' I
30" Poured Concrete
Sonotube
".' ~!.
.. /'..
.:....
. ..~"', ';"
X B.M. Top of concrete light pole base
759.82
Plan View
Silt Fence
24' Concrete Sonotubes
for bridge and
approach support
"Flow-Through"
Approach
Approach Fill Area
Clear Span
Bridge
B
~<f
x'li
'"
~
c(
Cl
c:
:g
'"
c..
1ii
.c
Q.
Vi
c(
Existing Bridge
23.5'
Co
11'
40'
B
x~
'!i
l:l'"
""x
Co
Sawyer
Creek
Water level 7/27/06 = 748.50:t
~I
u::
File: 3060engr.dwg
Date: 03/26/2007
Drafted By: Katie
Sheet: 1.2
Mar 26, 2007 - 06:01 PM J:\Projects\3060pam\dwg\3060engr.dwg Printed by: katie
(j'
.-w 1811 Racine Street
........~.,...E"'L.. Menasha, Wisconsin
ENGINEERING Ph. 920-991-1866, Fax 920-830-9595
Davel Engineering, Inc.
Civil Engineers and
Land Surveyors
J:
UJ
OUJ
~.z
. J: 0
~(J)~
CDO~
Q.LLW
o 0
D:>-m
C) !:: c
.: 0 0
C ~O
CD~...J
"'WLL
CD W
Eo::...J
EO<C
oo::z
D.wQ
1:::>-0
<C~w
<(0::
(J)
<Il
t/J
<<I
Q) Ql CD
t/J .9 0 0 0 0 ('i) r-- 0 r-- "- Ol 0 r-- IX) r-- 10 0
t/J III 0 0 0 0 Ol en 10 O'l IX) '<t ('i) en Ol N N N
<<I ~ Ql 0 0 0 0 0 N N N N N N ...... 0 0 0 0
~ U OJ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
U Ql "C ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci
.5 0 'C I
CD
0
N
Ql
CD OJ
"C
~ 'C
CD ~ &I) C') Cl 11) C') .... II) C'ol .... C') "'" Cl en 11) C'ol
0 0 .... en C') .... .co ~ "'" "'" C'ol en ~ C'ol en .... C'ol Cl
co C') Cl CD Cl C') C'ol C') en co 11) "'" Q) C') Cl. C')
"C N Ql "'" co Q) Cl .... ..... C'ol N C'ol ~ CD co "'" C'ol C'ol ~
<Il ~ .!!! cO cO cO ai ai ai ai ai ai ai ai ai N ...: ...: ...:
t/J
0 ~ il:d 10 10 10 10 10 10 10 &I) &I) &I) 10 &I) CD CD CD CD
a. "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'"
e {!
a. ::l
U)
<Il
'tl U
~ ~ &I) C') Cl C'ol CD .... co &I) C'ol C') Cl co C'ol Cl C'ol
0 .... Q) C') .... en ~ .N "'" C') ~ .... C') co en Cl co
0 ::I co C') Cl CD Q) Cl Cl Cl CD CD C') &I) Cl C'ol Cl C'ol
u:: U) = "'" co Q) Cl Cl .... C'ol N C'ol ~ CD co co C'ol C'ol '<t
CD "- cO cO cO ai ai ai ai ai ai ai ai ai N ...: ...: ...:
.e 10 &I) &I) &I) &I) &I) &I) &I) &I) 10 &I) &I) CD CD CD CD
1/1 "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'" "'"
Cll Cll
l:O 3:
Ql l-
e: OJ Ql 0:: Ql <Il
0 "C ~ W ~
<Il :u 'C W ::l
~ IX) CD Ol CJ N '<t 10 ::i N ([) ClO en e:
::l Ql r-- >'IX) 0 10 en >. 0 N ~ ('i)
r-: r-: alN <Xi <Xi <Xi <Xi <Xi <Xi 1:: ......
0 U) N "C 0:: :::l <Xi N ('i) ('i) ('i) ('i)
U) N e: N N N N N N N Ql <(
t/J ::l a. CD 0 N a.
OJ t/J iij e e .s=
e . >< m
e: <<I a. a.
'a 0 z w
0
0
u:
e:
,Q
1ii
u
..Q
13
Ql
'e-
a.
11
.
~~jmmm~(ffIm!JmiliH .Hiimmcnt.
750.3386 2.82 1497.27
490.00 749.8743 '4.81 778.13 183.76
490.00 749.8743 4~81 778.13 183.76
475.00 749.6830 3.34 1028.30 221.21
475.00 749.6830 3.34 1028.30 221.21
370.00 749.3542 3.75 910.33 281.37
370.00 749.3542 3.75 910.33 281.37
200.00 749.1912 2.90 1141.85 260.76
200.00 749.1912 2.90 1141.85 260.76
0.50 748.9598 3.83 817,41 120.06
0.50 748.9598 3.83 817.41 120.06
Bridge
200.00 748.9512 3.83 817.27 120.01
200.00 748.9512 3.83 817.27 120.Q1
335.00 748.9042 3.10 1018.83 153.91
335.00 748.9042 3.10 1018.83 153.91
130.00 748.7673 3.23 975.88 148.69
130.00 748.7673 3.23 975.88 148.69
748.8000 2.16 1488.39 236.13
748.8000 2.16 1488.39 236.13
HEC-RAS River: RIVER-1 Reach: Reach-1 Profile: PF 1 (Continued)
~^'-'7'i'-.
~~,ED '\.
(q^,
\cnr" ' )
" \)~/
'"~
':;~e~i:i ' ' '" , .. .;,'.an';' ,., ." ':i 'l:;!~i~~::I'" 'i'" ~fil' ''1'"'' .~. t~" '''''li~i:, ................ ."'..
" . ..... ,U1op:'wldth'.
.....". ~t~ ~i;1 ~Il~ it~ff);! i!~;. i~ 1~ ~i ]:
435.00 758.8395 4.21 1664.81 446.43
;.1 435.00 758.8395 4.21 1664.81 446.43
..
'fi
50.00 758.7814 2.98 122o.a8 145.00
50.00 758.7814 2.98 1220.68 145.00
.., ,
226.00 758.1702 6.06 493.36 ' 602.93
; 226.00 758.1702 6.06 493.36 602.93
~
" Culvert
,
90.00 757.7727 6.29 475.47 891.03
90.00 757.7727 6.29 475.47 891.03
240.00 757.7728' 4~27 678.42 91.00
240.00 757.7728 4.27 678.42 91.00
..~ '. 145.00 757.1193 6.38 505.05 200.00
~"'ml 145.00 757.1193 6.38 505.05 200.00
......
:~:l:: ;.
230.00 756.9681 5.11 666.41 210.00
230.00 756.9681 5.11 666.41 210.00
140.00 756.2778 6.15 535.06 117.91
140.00 756.2778 6.15 535.06 117.91
190.00 756.1511 5.10 746.48 199.01
190.00 756.1511 5.10 746.48 199.01
380.00 755.6084 , 5.75 600.69 195.42
380.00 755.6084 5.75 600.69 195.42
35.00 755.0874 4.49 682.25 159.92
35.00 755.0874 4.49 682.25 159.92
25.00 755.0275 4.85 785.82 200.00
25.00 755.0275 4.85 785,82 200.00
0.50 754.3433 6.99 367.70 55.00
0.50 754.3433 6.99 367.70 55.00
i
Bridge
90.00 752.4456 8.90 306.02 56.07
90.00 752.4456 8.90 306.02 56.07
470.00 752.7048 5.53 1175.73 306.45
470.00 752.7048 5.53 1175.73 306.45
760.00 751.6000 6.07 875.94 300.00
760.00 751.6000 6.07 875.94 300.00
760.00 751.0717 3.28 1527.91 450.00
760.00 751.0717 3.28 1527.91 450.00
-
570.00 750.5630 3.34 1139.95 294.54
570.00 750.5630 3.34 1139.95 294.54
.". 430.00 750.3386 2.82 1497.27 370.00
HEC-RAS River: RIVER-1 Reach: Reach-1 Profile: PF 1 (Continued)
~...~~ \\\E...7)~
f~" ~\.
{CfJ ~~f(\~
, .,:!<,.
',,,' /.
. ~ ,'Y
,~
.: ):~e~ctl : ::F;Rive;;:~ta;!li ,j;' ...".. ,.., '." ,.""- :..t ... """ .. . .....$" ::;:::'::'.!';:': . . ii ................. ,..
I".; .:: !: ..: ~r .
:j tj:
100.00 769.8422 3.06 1521.33 250.00
.
230.00 769.8040 3.16 1689.71 300.03
230.00 769.8047 3.16 1689.91 300.04
.
1430.00 769.6285 1.77 1914.78 344.59
~'1430.00 769.6292 1.77 1915.03 344:61
60.00 768.5076 5.75 943.60 166.81
60.00 768.5089 5.74 943.81 166.82
0.50 767.4282 8.16 366.41 109.50
0.50 767.4302 8.16 366.53 109.54
Bridge
120.00 767.2000 8.47 352.97 150.05
120.00 767.2025 8.47 353.12 150.14
1400.00 767.2292 6.96 610.22 120.00
1400.00 767.2319 6.96 610.55 120.00
1490.00 762.8088 10.06 431.11 119.79
1490.00 762.7990 10.09 429.94 119.62
130.00 759.8530 5.00 1100.03 248.79
130.00 759.8727 . 4.98 1104.92 248.85
200.00 759.6313 5.13 1133.26 286.20
200.00 759.6543 5.10 1139.85 286.94
220.00 759.4642 4.48 1299.47 283.73
220.00 759.4891 4.46 1306.54 285.27
215.00 759.2635 4.71 1548.45 438.95
215.00 759.2922 4.68 1561.08 441.49
25.00 759.2078 2.60 1713.78 453.92
25.00 759.2375 2.58 1727.33 455.75
Culvert
150.00 759.2021 2.63 1688.95 . 452.78
150.00 759.2271 2.62 1700.27 454.36
91.00 759.1046 2.53 1601.80 460.87
91.00 759.1343 2.52 1615.54 463.46
89.00 759.0992 3.09 1477.25 399.42
1.00 759.1085 3.45 1444.83 399.71
68.00 759.0643 3.49 1427.22 398.34
180.00 759.0610 3.43 1714.72 408.00
180.00 759.0610 3.43 1714.72 408.00
1.00 758.9033 4.15 1693.32 448.43
1.00 758.9033 4.15 1693.32 448.43
Bridge
HEC-RAS River: RIVER-1 Reach: Reach-1 Profile: PF 1 (Continued)
.,.-q~:;
,~~..!) .
r;3J"~ .
I,f.l) ....,i\.\"
~. ",. '1\. \ ',"
. ('\, /"(d
..... n~Y..
""-~
:ii. Re.ac ...... .. ............ ... ... ...... ....'. . ....:;:Fi...:&~.:;;; .MOO
.. ..... ij ~~:~W:i.'''' ................. .......
; :~iI!~ '@1!ltmiji
340,00 776.5486 5.13 840.88 273.22
340.00 776.5486 5.13 84M8 273.22
310.00 776.1199 4.69 973.14 450.00
310.00 776.1199 4.69 973.14 450.00
240.00 775.7795 3.97 1031.00 348.90
240.00 775.7795 3,97 1031.02 348.90
10.00 775.8458 1.11 2869.98 675.93
10.00 775.8458 1.11 2870.02 675.94
90.00 775.8234 1.64 1846.40 674.26
90.00 775.8235 1.64 1846.44 674.26
5.00 775.8068 1.30 2487.28 870.00
5.00 775.8068 1.30 2487.33 870.00
200.00 775.8069 1.19 2582.54 870.00
200.00 775.8070 . 1.19 2582.59 870.00
40.00 775.7358 2.08 2365.71 880.00
40.00 775.7359 2.08 2365.81 880.00
..
0.50 775.6346 3.45 2124.29 780.00
0.50 775.6348 3.45 2124.38 780.00
Bridge
80.00 775.5616 2.87 2481.90 780.00
80.00 775.5617 2.87 2482.00 780.00
170.00 775.5679 2.33 2190.08 340.00
170.00 775.5680 2.33 2190.12 340.00
400.00 775.5501 2.36 2674.22 690.00
400.00 775.5502 . 2.36 2674.30 690.00
1670.00 775.5040 1.87 3218.51 760.00
1670.00 775.5042 1.87 3218.60 760.00
250.00 775.3669 1.29 4966.65 750.00
250.00 775.3671 1.29 4966.74 750.00
120.00 775.3531 1.15 4423.86 484.80
120.00 775.3533 1.15 4423.92 484.80
160.00 775.3450 1.32 3946.30 451.00
160.00 775.3452 1.32 3946.35 451.00
0.50 774.8953 6.34 788.21 70.00
0.50 774.8954 6.34 788.21 70.00
Bridge
200.00 769.4799 11.07 433.91 70.00
200.00 769.4807 11.07 433.96 70.00
100.00 769.8416 3.06 1521.16 250.00
HEC-RAS River: RIVER-1 Reach: Reach-1 Profile: PF 1
;)R~~9ti,:';;' ;. .... ................ .....................,..........c.........l.... ....:.....;.... ." ..';';.:.:...:;.......:.L. "$[':':' .:....,.:'.'.."..,':.,:;'jiif'.". "";:;';"~"~~;i'''':'''' .....;;;
. .
fEW
1890.00 811.3497 2.95 1025.76 408.30
1890.00 811.3497 2.95 1025.76 408.30
1720.00 809.6431 3.31 863.83 342.41
1720.00 809.6431 3.31 863.83 342.41
lj~
r;, 2020.00 806.1163 6.08 572.30 223.10
2020.00 806.1163 6.08 572;30 223.10
1060.00 802.5869 3.67 1013.77 341.60
1060.00 802.5869 3.67 1013.77 341.60
40.00 800.9194 4.12 657.92 117.00
40.00 800.9194 4.12 657.92 117.00
0.50 800.0630 7.34 317.53 701.73
0.50 800.0630 7.34 317.53 701.73
Bridge
SO.OO 798.7184 8.70 267.78 456.81
SO.OO 798.7184 8.70 267.78 456.81
890.00 798.5164 8.38 343.03 77.00
890.00 798.5164 8.38 343.03 77.00
1600.00 797.7906 3.20 109B.88 343.99
1600.00 797.7906 3.20 1098.88 343.99
810.00 795.9373 6.24 808.35 498.71
810.00 795.9373 6.24 808.35 498.71
1420.00 792.8000 7.85 595.21 258.00
1420.00 792.8000 7.85 595.21 . '258.00
7SO.00 790.2865 3.31 1037.93 208.09
780.00 790.2865 3.31 1037.93 208.09
900.00 788.5114 7.73 760.42 262.79
900.00 788.5114 7.73 760.42 262.79
720.00 785.1196 6.19 623.42 231.70
720.00 785.1196 6.19 823.42 231.70
930.00 781.6304 6.63 821.03 329.48
930.00 781.6304 6.63 821.03 329.48
40.00 780.9939 3.17 703.34 120.00
40.00 780.9939 3.17 703.34 120.00
0.50 780.9490 3.38 766.32 502.57
0.50 780.9490 3.38 766.32 502.57
Bridge
80.00 777.5117 6.99 250.22 457.49
80.00 777.5117 6.99 250.22 457.49
680.00 m.7161 5.43 960.37 317.21
'..<0 680.00 777.7161 5.43 960.37 317.21
State of Wisconsin \ DEPARTMENT OF NATURAL RESOURCES
WISCONSIN
DEPT. OF NATURAL RESOURCES
101 S. Webster St.
Box 7921
Madison, Wisconsin 53707-7921
Telephone 608-266-2621
FAX 608-267-3579
TTY Access via relay - 711
Jim Doyle, Governor
Scott Hassett, Secretary
-"""'~""=i' ffFD
~]".j'"=~ ',~"\~,,.~,
U ll.t6..-<::..t.#i=_ 14 i!.=
MAR 3 0 2007
COtvlMUNlTY DEVELOPMENT
\
March 29, 2007
Mr. David Buck - Principal Planner
City of Oshkosh
215 Church Street
P.O. Box] ]30
Oshkosh, W] 54903-] 130
Subject: Pommerening Bridge - Hydrology and Hydraulics Review
Dear Mr. Buck:
We have reviewed the changes to the Pommerening Bridge proposal. The hydrology and hydraulics were
submitted by Davel Engineering under the Professional Seal of John Dave!. This review included all
submittals through March 23,2007.
Based on these submittals, the proposed 19 ft wide bridge structure does not cause an increase in the BFE
.01 ft or greater on any properties other than those owned by Mr. Pommerening, and as such, it meets the
Standards ofNR 116. This approval is only based on the requirements ofNR 116. 1t does not relieve any
other State, Federal or Local permit requirements that may be necessary. Please contact me at (608) 266-
1925 with any questions and/or comments relative to this review.
. SiIi.CY reellyy"
M.a-a.~
Dean A. Stitgen, P.E~
Cc:
Mike Russo-
Chery] Laatsch-
Kristy Rogers -
Linda Hyatt -
Meg Galloway -
John Davel, PE -
NER
Oshkosh
NER
Wautoma
WT2
Davel Engineering, Inc.
] 8] ] Racine Street
Menasha, W] 54952
dnr.wLgov
wisconsin.gov
Quality Natural Resources Management
Through Excellent Customer Service
o
Printed on
Recycled
Paper
'"
I'-l I
CX> r-
(0 m
+" I Gl
\. m
z
0
I
\
~ '" ,"0 5 ~
ill \i H
U ~ "
" ~
~ ~ ill!) ;
~~ ~
~:! ~,?
r' ~ g ~
g ~ ~
~
? I i ~i !
if -R"~ I:;)
I\)b ~
~ ~ ~ ~ fd
r'
I
I I.,
I +.. I \ \
\ \'\, \\\
\ "\ \
'\. \ i.,
\
\
\
\
67,1
I
+"
\
+"
'"
~
+"\
+"
~
.,
---
/
/
f
r
",
"-
'\
"
1
I
I
// r-. '\
r-.... j G
/ /'1\ L
/ '--' \
)
;- .-" ~-._~-
~
I
'"
--'O:"'-~---------
N. WASHBURN ST.
U.S.H. "41" .
g.
.
-,,--
/
~
.I..
wmmiW; ~~
~~i8ia!ll5'~:!l !II:
~h~IW~i
~~~~i'~~~:
.. if . I
gl -I . !l
.~ IJ il .
n ~. i ;
11 1 ~ .
~l I!: i
'l I. I
i i ~ .
f f! r
i i' 1
i ~
t i
~ ~
en
(1)
a
cl' <
::I -.
n
I'-l :i'
:" ~.
js::
CX>0l
,:<:'0
~
en
m
.~
POMMERENING CHEVROLET
CllY OF OSHKOSH, WINNEBAGO COUNlY, WI
FOR: ART POMMERENING
~~ DAVEL ENGINEERING,IN
..=.. CNl!. ENGINEERING CONSULTANTS.
~, 1811 RaelneStrael MllIl8$lla.WI So
~.J4"E5'L. Ph: 920-991-1866 Fax: 920-830-:9
~NG '
FLOOD PLAIN MAP