HomeMy WebLinkAbout0124223-Building (raze & rebuild garage)
e
OSHKOSH
ON THE WATER
Job Address 1357 WAUGOO AVE
CITY OF OSHKOSH No 124223
BUILDING PERMIT - APPLICATION AND RECOR[)
OWner MRlMRS MICHAEL P DAEHN Create Date 04/13/2007
Contractor BEST BUILT GARAGE BUILDERS
Designer
Category
149- Raze detached garage, construct detached garage Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Sq. Ft.
Rooms
Height
Ft.
D Projection I
Canopies
Finished/Living
Bedrooms
Stories
Garage
Baths
Signs
Foundation
o Poured Concrete . Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Park Dedication
o
Height Permit
# Structures
Occupancy Permit
Flood Plain
# Dwelling Units
o
Use/Nature SFRI Constructing a 24' x 24' garage/ razing existing garage. to be located in the rear yard, pouring a new driveway from the street to the
of Work new garage.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$28,400.00 Plan Approval
$0.00 Permit Fee Paid
$175.00 Park Dedication
$0.00
Issued By:
Date 04/13/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcel Id # 0205630000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and re any necessary a ov bef re starting such activity. #
Date~ ~; CJ
Agent/Owner
Address PO BOX 317 MARSHALL WI 53559 - 0000 Telephone Number 920-722-7350
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.