HomeMy WebLinkAbout0124182-Building (alterations)
e
OSHKOSH
ON THE WATER
Job Address 500-550 S KOELLER ST
CITY OF OSHKOSH
No
124182
BUILDING PERMIT - APPLICATION AND RECORD
Owner RIVER VALLEY ONE LLC
Create Date
:
I
04/11/2007
Designer
Gries
Contractor R J ALBRIGHT INC.
Category
232 - Alteration Stores & Customer Service
PI~n X4-1927-0307
!
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Canopies
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Signs
Garage
Baths
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Required
Flood Plain No
Height Permit Not R~quired
Not Required
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature 520/ Tenant space alterations per plans for Run Away Shoes.
of Work
I
Plumbing Contractor
HV AC Contractor
Electric Contractor
Fees: Valuation
0.00 Plan Approval
$0.00 Permit Fee Paid
$163.00 Park Dedication
$0.00
Issued By:
Date 04/11/2007
FinaI/O.P. 00/0010000
o Permit Voided I
Parcel Id # 0611620000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easem~nt
holder(s) and to secu sary rting such activity.
~
Signature ..
Date
~/l0/
Address 5711 GREEN VALLEY RD
OSHKOSH
WI 54904 - 9700 Telephone Number 231-8635
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Perrnit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.