Loading...
HomeMy WebLinkAbout0124182-Building (alterations) e OSHKOSH ON THE WATER Job Address 500-550 S KOELLER ST CITY OF OSHKOSH No 124182 BUILDING PERMIT - APPLICATION AND RECORD Owner RIVER VALLEY ONE LLC Create Date : I 04/11/2007 Designer Gries Contractor R J ALBRIGHT INC. Category 232 - Alteration Stores & Customer Service PI~n X4-1927-0307 ! Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Canopies Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Required Flood Plain No Height Permit Not R~quired Not Required # Dwelling Units o # Structures o Park Dedication Use/Nature 520/ Tenant space alterations per plans for Run Away Shoes. of Work I Plumbing Contractor HV AC Contractor Electric Contractor Fees: Valuation 0.00 Plan Approval $0.00 Permit Fee Paid $163.00 Park Dedication $0.00 Issued By: Date 04/11/2007 FinaI/O.P. 00/0010000 o Permit Voided I Parcel Id # 0611620000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easem~nt holder(s) and to secu sary rting such activity. ~ Signature .. Date ~/l0/ Address 5711 GREEN VALLEY RD OSHKOSH WI 54904 - 9700 Telephone Number 231-8635 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Perrnit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.