HomeMy WebLinkAbout0124129-Building
e
OSHKOSH
ON THE WATER
Job Address 1736 SANDERS ST
CITY OF OSHKOSH No 124129
BUILDING PERMIT - APPLICATION AND RECORD
Owner MICHAEUCOLLEEN STADLER Create Date 04/09/2007
Designer
Contractor THORS FULL SERVICE REMODELING
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFRI Bathroom remodel* including removing and replacing drywall. Seperate permits will be required for electric and plumbing work. No
of Work ~tructural work.
HV AC Contractor
Plumbing Contractor SOPER PLUMBING
Electric Contractor SECKAR ELECTRIC CO INC
$4,500.00 Plan Approval
$0.00 Permit Fee Paid
$53.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
~Tf
Date 04/09/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1410090700
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu e any necessary approvals before starting such activity.
Signature
~
Date
>< tc /r /07
Address W4040 BIRCH RD
Agent/Owner
FOND DU LAC
WI 54935 - 0000 Telephone Number 920-410-3500
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.