Loading...
HomeMy WebLinkAbout0124111-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 864 KEENVILLE LN CITY OF OSHKOSH No 124111 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner HUISMAN HOMES LLC Create Date 04/04/2007 Category 401 - Residential-Exterior (laterals) Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor FREUND EXCAVATING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Extend sanitary and water laterals to NSRF. i . Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New Storm Sewer Water Service 1-1/4" Plastic Lateral 1 New Parcelld # 1550010300 $3,500.00 $0.00 $100.00 D Permit Voided I Plan Approval Permit Fees Date 04/09/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in thi ermit application w'thin an ease ent, the City strongly urges the permit applicant to contact the easement hold r s) and to-?ec y necessa pprovals before starting such activity. Signature Date '1- 9.07 AgenUOwner OMRO WI 54963 - 0000 Telephone Number 920-685-2196 Address 3135 DELHI RD To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.