HomeMy WebLinkAbout0124091-Building
e
OSHKOSH
ON THE WATER
Job Address 1233 HARRISON ST
CITY OF OSHKOSH No 124091
BUILDING PERMIT - APPLICATION -AND RECORD
Designer
Contractor PACKER VAllEY BUilDERS, INC
140 - Interior Remodeling P an
. Building o Sign o Canopy o Fence o Raze I
Class of Const: Size
asement Sq.Ft. Rooms Height Ft. o Projection I
- - -
ng Sq.Ft. Bedrooms Stories Canopies
- - -
Sq. Ft. Baths Signs
- - -
. Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
ermit Not Required Flood Plain Height Permit
-
on # Dwelling Units 0 # Structures 0
-
SFR/ Remodeling the kitchen.* Opening the exterior wall and installing new insulation and drywall. New kitchen cabinets, countertops,
and flooring will be installed.
ctor MCM AIR INC Plumbing Contractor UNKNOWN
ractor BEEZ ELECTRIC INC
Owner CHARLES R NITZ Create Date 04/05/2007
Category
Type
Zoning
Unfinished/B
Finished/Livi
Garage
Foundation
Occupancy P
Park Dedicati
Use/Nature
of Work
HV AC Contra
Electric Cont
Fees: ValUatlO~
Issued By: ~
$10,000.00 Plan Approval
$0.00 Permit Fee Paid
$88.00 Park Dedication
$0.00
Date 04/05/2007
Final/O.P. 00/00/0000
o Permit Voided I . Parcelld # 1500410000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction. J
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the ork
described in this permit appli . n within an e ent the City strongly urges the permit applicant to contact the easemJnt
holder(s) and to secure an ry aR 0 s b starting such activity. I _ __--
Signature ~ o/<)"k7
Agent/Owner (I '-7
OSHKOSH
WI 54904 - 0000
Telephone Number
920-232-7620
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permi Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), yoJr Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is rec,ived. Work may
continue if the inspection is not performed within two business days from the time the project is ready.'
I
i
"o.t