Loading...
HomeMy WebLinkAbout0124087-Plumbing (fixtures) e OSHKOSH ON THE WATER Job Address 1111 ELMWOOD AVE Contractor KOCH PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature SFR / REPLACE EXISTING PLUMBING FIXTURES **debtacct of Work Valuation Issued By 1 Shower Floor Drain 2 Lndry Tray 2 Disposal 1 Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind CITY OF OSHKOSH No 124087 PLUMBING PERMIT - APPLICATION AND RECORD Owner PIE INVESTMENTS LLC reate Date . 04/05/2007 Plan Shamp Sink I Coffee M~k'~;. Flr/Wst Sink - lint GreaseTra~ ~::: :t:sin == I ::zG~:~:Trap = Urinal --- I Eye Wash Statl1.- Standp Ree -== I Wtr Sewer Mtrs Ice Maker . Deduct Meters Gar Drain Wtr Usage Mtrs Soda Disp Category 410 - Residential-Interior Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Wait. St. Ice Chest Exam Sink Seulry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Sanitary Sewer Size Material Type # Conn. Type Storm Sewer Water Service $1,500.00 ~W Parcelld # 0506610000 Plan Approval $0.00 $56.00 0 Permit Voided I l I In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. I While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Permit Fees Date 04/05/2007 Date Agent/Owner Address 2005 DOTY ST OSHKOSH WI ~~02 _ - 7040 Telephone Number 9?0-23_1-6661 or 235 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Pet-mit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), tour Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is ~eceived. Work may continue if the inspection is not performed within two business days from the time the project is ready.