HomeMy WebLinkAboutLetter-Ahern (fire system)
~~
~
MAt< i ~ 2001
I I
, I
201 M rris Court, P.O. Box 1316
Fo d du Lac, WI 54936-1316
(920) 921- 020 P · (920) 921-8666 f
www.ahernfire.com
FIRE PROTECTION
March 28, 2007
Building Inspector -- Brian Noe
City of Oshkosh
215 Church Avenue -- PO Box 1130
Oshkosh, WI 54901
T -920/236-5051
F-920/236-1130
RE: FIRE PROTECTION SYSTEM INSTALLATION
BALDOR ELECTRIC
3815 OREGON STREET
OSHKOSH, WISCONSIN 54902
AHERN FIRE PROTECTION CONTRACT No. 490501
Dear Brian:
Enclosed is a copy of the Contractor's Material and Test Certificates covering the a ove-referenced
Fire Protection System Installation for your files.
Very truly yours,
AHERN FIRE PROTECTION
A division of J. F. Ahern Co.
JtwJvg}. $~w
Mark L. J ozefowski, Superintendent
MLJ/ksj
LCITY03-28-2007.DOC
Building the Midwest Since 1880
An Equal Opportunity Employer
.~
~scons;n
Department of Commerce
Regulated Object Number:
Double Check/DC Detector
Perfomance Test MAR 29 2001
afety and Buildings Division
.0. Box 7302
adison, WI 53707-7302
ax: (608) 267-9723
: (608) 264-8777
ttp://www.commerce.state.wi.us
ttp:/Iwww.wisconsin.gov
Personal information you provide may be used for secondary purposes [Privacy Law, 5.1504 (1 )(m)J.
OWNER INFORMATION Please print clearly in ballpoint pen. Additional information on back page.
Ow Street Addres _
j
Owner's Contact Person
State . _,~~CoAe
" J''T,:/L! cJ.,
~'rJs
Assembly Type
o DC Detector
Initial Test
~t check
Close!:! tight
. 0 Leaked
_~a!C J, ~
Final Test
o Closed tight
Static
PSID
2'''d''check
Closed tight
[;L;~aked.., ~1
Static V, cI'\
PSID
PSID
o Closed tight 2'nd check
Static
PSID
DETECTOR BYPASS ASSEMBLY INITIAL TEST
1'st check 2'nd check
o Closed tight 0 Closed tight
o Leaked 0 Leaked
Static
PSlD _ _ _ _S,l2.tlP
PSID
DETECTOR BYPASS ASSEMBLY FINAL TEST
o Closed tight 0 Closed tight
Static PSID Slal(c
PSID
oW<(.d # lI'1tJ,
ASSEMBLIES IN FIRE PROTECTION SYSTEMS
Forward Flow Test J LI ./ ~
Designed flow rate 7b U . GPM
Note: Include hose stream dem nd where applicable
Indicating Control Valves
t& No. one control valve open
Part(s) Replaced/Comments
Actual flow rate
GPM
. No. two control valve open
Valve supervision:
o Locked
I HEREBY CERTIFY THE TEST RESULTS ARE TRUE AND THE TEST WAS CONDUCTED BY ME PE SONALL Y.
Tester Name (print) a" RegistartionNo)31993 Time of Day 1/'t)t1 PI1
Tester Signature Phone No77'o14 .. 9J..j-If?,' Date 3 /J,1/<:j'?
SBD- I 07 Distributed to the following: Owner and tester rptB ank_ WIDoUbleCh~
AHERN FIRE PROTECTION ~ AR 2 9 2007
Contractor's Material and Test Certificate for Aboveground )iping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's repres ntative. All defects shall be
corrected and system left in service before contractor's personnel finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and c )ntractor. It is understood the
owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving
authority's requirements or local ordinances.
PROPERTY NAME Baldor Electric AFP Contract #: 490501 T DATE: December 6, 2006
PROPERTY ADDRESS 3815 Oreaon Street Oshkosh, V'u I 54902
ACCEPTED BY APPROVING AUTHORITIES (NAMES)
1. Factory Mutual Global (Mr. Kim McCluskey P. E.)
2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky)
3. City of Oshkosh (Building'lnspector -- Brian Noe)
4.
ADDRESS
Plans 1. W184 N8311 Tours Drive -- Menomonee Falls, WI 53051
2. 101 Court Street -- Oshkosh, WI 54901
3. 215 Church Avenue - PO Box 1130 -- Oshkosh, WI 54901
4.
INSTALLATION CONFORMS TO ACCEPTED PLANS ~ES DNO
EQUIPMENT USED IS APPROVED ~S DNO
IF NO, EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION ~ES DNO
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT?
INSTRUCTIONS IF NO, EXPLAIN
HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES:
Item No.'s 2 & 3 will 1. SYSTEM COMPONENTS INSTRUCTION DYES c;;;}1'iIO
be forwarded by AFP 2. CARE AND MAINTENANCE INSTRUCTIONS DYES [31iio
at closeout time.
3. NFPA 25 DYES .k3-N'o
LOCATION OF SUPPLIES BUILDINGS
SYSTEM System #5 Auxiliary Dry - Test Cells
MAKE MODEL YEAR OF K- Q ANTITY TEMPERATURE
MANUFACTURE FACTOR RATING
Vikina Micromatic M VK1 04 Sidewall 1/2" Brass 2006 5.6 286 Deo.
Viking Micromatic M VK200 Upright 3/4" Brass 2006 8.0 96 286 Deg.
SPRINKLERS
PIPE AND TYPE OF PIPE 1000' Schedule 1 Q' Galvanized
FITTINGS TYPE OF FITTINGS Grooved' Threaded' Welded Outlets' Mechanical Tees
FLOW ALARM DEVICE MAXIML MTIME TO OPERATE
THROUG H TEST CONNECTION
TYPE MAKE MODEL MIN. SEC.
Pressure Switch Potter PS10A ~9
.. .... N/A
EXPLAIN ANY ALARM PROBLEMS: .
ALARM
DEVICES LOW AIR ALARM DEVICE ALARM OPERATED
TYPE I MAKE I MODEL PRESSUR PRO PERL Y
Pressure Switch Potter PS40A SETTING P 51 YES I NO
.x-' I
EXPLAIN ANY ALARM PROBLEMS:
.
i
Ahern Fire Protection
CENTRAL MONITORING SIGNALS RECE VED
ALARM SERVICE LOCAT10N(S)
TYPE OR PRESSURE
NAME OF REMOTE WATERFLOW SWITCH LOW-AIR OTHER
SERVICE DETECTOR FLOW SU PERVISORY
SUPERVISING LOCATION(S):
STATION
(ON-SITE) 4o?j' /-- /-
..........
REMOTE REMOTE NAME OF SERVICE:
MONITORING
ALARM SERVICE
SIGNALING (OFF-SITE)
PHONE:
OTHER: LOCATION(S):
EXPLAIN ANY ALARM SIGNALING PROBLEMS:
DRY VALVE Q.O.D.
MAKE MODEL SERIAL NO. MAKE MODE SERIAL NO.
\! I \L ilV'?- ,.,. WOC:I~ I lftJ S-
!-I
TIME TO TRIP WATER TRIP POINT AIR TIMEW ".TER I ALARM
THROUGH TEST PRESSURE AIR PRESSURE PRESSURE REACHE TEST OPERATED
CONNECTION'.2 OUTL T,.2 I PROPERLY
DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO
OPERATING WITHOUT j~ /74 4j 3~ ;(Cj .~,
TEST Q.O.D.
WITH
Q.O.O.
IF NO, EXPLAIN: ,
OPERATION: D PNEUMATIC o ELECTRIC o HYDRAULIC
PIPING SUPERVISED DYES DNO DETECTING MEDIA SUPERVIS 0 J:]X-ES DNO
DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL ~ S-- DYES DNO
IS THERE AN ACCESSIBLE FACILITY IN EACH ~
DELUGE & CIRCUIT FOR TESTING
PREACTION DYES DNO
VALVES --
~~IT DOES EACH CIRCUIT MAXIMUM TIME TO
OPERA T PERVISION OPERATE VALVE RELEASE .OPERA TE RELEASE
MAKE MODEL OSS ALARM
~ ../
YES NO YES NO MIN. SEC.
~ ,
/
LOCATION & MAKE & MODEL SETTING STATIC PRESSURE RESIDUAL, RESSURE FLOW RATE
PRESSURE FLOOR (FL01 -'lING)
REDUCING INLET 011"1"1 . INLET OUTLET FLOW
VALVE TEST ~ (PSI) (PSI) (PSI) (GPM)
-- ------
,--------
, MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED,
2 NFPA 13 ONLY REQUIRES THE SO-SECOND LIMITATION IN SPECIFIC SECTIONS,
2
i
Ahern Fire Protection
ydrostatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 b rs) above static pressure in
excess of 150 psi 0.2 bars) for two hours. Differential dry-pipe valve clappers shall be left open during test to pre ent damage. All
Iping leakage shall be stopped.
PNEuMATIC) Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1f2 psi (0.1 ba ) in 24 hours. Test
ranks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1-1f2 psi (0.1 bars) in 24 hours.
TEST
DESCRIPTION
TESTS
ALL PIPING HYDROSTATICALLY. TESTED AT aa.-~SI (_Bar) for . HRS.
DRY PIPING PNEUMATICALLY TESTED g:rVES 0 NO
EQUIPMENT OPERATES PROPERLY GYVES 0 NO
DO YOU CERTIFY AS THE SPRINKLER CO CTOR THAT ADDITIVES AND CORROSIVE C
SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMIC
F TESTING SYSTEMS OR STOPPING LEAKS?
YES 0 NO
DRAIN READING OF GAUGE LOCATED NEAR WATER'
TEST SUPPLY TEST CONNECTION:1:2:::(: PSI ( Bar)
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER
FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING.
VERIFIED BY COpy OF THE CONTRACTOR'S MATERIAL AND TEST
CERTIFICATE FOR UNDERGROUND PIPING. 0 YES ~
FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YES~O
IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS
REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED?
DYES ,zoo
NUMBER USED LOCATIONS
I NO, STATE REASON
WITH VALVE IN TEST
IDE:Lf> ~ PSI LBar)
EXPLAIN
hI
BLANK
TESTING
GASKETS
YES 0 NO
IFYES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING
PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
ONO
WELDING
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS
QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS
ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND
OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE'INTERNAL
DIAMETERS OF PIPING ARE NOT PENETRATED?
ONO
DNO
CUTOUTS
(DISCS)
HYDRAULIC
DATA
NAMEPLATE
REMARKS
, DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL
CUTOUTS (DISCS) ARE RETRIEVED?
NAME PLATE PROVIDED
"YES 0 NO
ONO
SIGNATURES
3
_'M"!
AHERN FIRE PROTECTION
~1AR 2 9 2001
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's repres ntative. All defects shall be
corrected and system left in seNice before contractor's personnel finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and ontractor. It is understood the
owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failurE to comply with approving
authoritv's reauirements or local ordinances.
PROPERTY NAME Baldor Electric AFP Contract #: 490501 T DA T: November 28, 2006
PROPERTY ADDRESS 3815 Oreqon Street Oshkosh, VII 54902
Plans
ACCEPTED BY APPROVING AUTHORITIES (NAMES)
1. Factory Mutual Global (Mr. Kim McCluskey P. E.)
2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky)
3. City of Oshkosh (Building Inspector -- Brian Noe)
4.
ADDRESS
1. W184 N8311 Tours Drive -- Menomonee Falls, WI 53051
2. 101 Court Street -- Oshkosh, WI 54901
3. 215 Church Avenue -- PO Box 1130 -- Oshkosh, WI 54901
4.
INSTALLATION CONFORMS TO ACCEPTED PLANS
EQUIPMENT USED IS APPROVED
IF NO, EXPLAIN DEVIATIONS
,
AYEsS 0 NO
~ ONO
.
INSTRUCTIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT?
IF NO, EXPLAIN .
~ ONO
LOCATION OF
SYSTEM
HAVE COPIES OFTHE FOLLOWING BEEN LEFT ON THE PREMISES:
1. SYSTEM COMPONENTS INSTRUCTION
2. CARE AND MAINTENANCE INSTRUCTIONS
3. NFPA 25
SUPPLIES BUILDINGS
System #4
DYES ...05'No
DYES j;2pNo
DYES l;d..Ne-
Item No.'s 2 & 3 will
be forwarded by AFP
at closeout time.
MAKE MODEL YEAR OF K- o JANTITY TEMPERATURE
MANUFACTURE FACTOR RATING
Vikina ESFR VK500 Pendent 3/4" Bronze 2006 14.0 210 165 Dec.
Viking Micromatic M VK200 Upright 3/4" Bronze 2006 8.0 220 286 Deg.
Vikinc Microfast M OR VK302 Pendent 1/2" Chrome 2006 5.6 15 155 Dea.
SPRINKLERS
\
,;.
'~;~l+il~~~"
FLOW ALARM DEVICE
TYPE
Water Flow Detector
N/A
EXPLAIN ANY ALARM PROBLEMS:
MAKE
System Sensor
MODEL
WFD
ALARM
DEVICES
TYPE
N/A
LOW AIR ALARM DEVICE
I MAKE I
MODEL
PRESSURE
. SETTING F SI
ALARM OPERATED
PROPERLY
YES I NO
I
.
EXPLAIN ANY ALARM PROBLEMS:
.
.
.
Ahern Fire Protection
CENTRAL MONITORING SIGNALS REC IVED
, LOCATION(S)
ALARM SERVICE
TYPE OR PRESSURE
NAME OF REMOTE WATERFLOW SWITCH LOW-AIR OTHER
SERVICE DETECTOR FLOW S PERVISORY
SUPERVISING LOCATION(S):
STATION
(ON-SITE) v<
PrD'f
REMOTE REMOTE NAME OF SERVICE:
MONITORING
ALARM SERVICE
SIGNALING (OFF-SITE)
PHONE:
OTHER: LOCATION(S):
EXPLAIN ANY ALARM SIGNALING PROBLEMS:
,
DRY VALVE O.O.D
, MAKE MODEL SERIAL NO. MAKE MODE SERIAL NO.
TIME TO TRIP WATER TRIP POINT AIR TIME v.. Il.TER ALARM
THROUGH TEST PRESSURE AIR PRESSURE PRESSURE REACHE ) TEST OPERATED
CONNECTION'.2 ---e1:l'f1 T0 PROPERLY
DRY PIPE MIN. SEC. PSI PSI F'SJ-- MIN. SEC. YES NO
OPERATING WITHOUT l--'
TEST Q.O.o. , ------
WITH ----
Q.O,D.
]FNO'~~
OPERATION: o PNEUMATIC 0 ELECTRIC o HYDRAULIC
PIPING SUPERVISED DYES DNO DETECTING MEDIA SUPERVISED DYES DNO
DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATION DYES DNO
------'"
IS THERE AN ACCESSIBLE FACILITY IN EACH ~~~
DELUGE & CIRCUIT FOR TESTING .~_
PREACTION DYES 0 NO
VALVES
~EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO
MODE~ PERATE SUPERVISION OPERATE VALVE RELEASE OPERATE RELEASE
MAKE' LOSS ALARM
YES NO YES NO MIN. SEC.
.
LOCATION & MAKE & MODEL. SETTING STATIC PRE<::<::IIRJ: RESIDUAL F RESSURE FLOW RATE
PRESSURE FLOOR - (FLO\ ING)
REDUCING ------ INLET OUTLET 'INLET OUTLET FLOW
VALVE TEST (PSI) (PSI) (PSI) (PSI) (GPM)
.~
1 MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED.
2 NFPA 13 ONLY REQUIRES THE 60-SECOND LIMITATION IN SPECIFIC SECTIONS.
2
.
TEST
DESCRIPTION
TESTS
BLANK
TESTING
GASKETS
WELDING
CUTOUTS
(DISCS)
HYDRAULIC
DATA
NAMEPLATE
REMARKS
Ahern Fire Protection
HYDROSTAJ:Je: Hydrostatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 ars) above static pressure in
excess of 150 psi (10.2 bars) for two hours. Differential dry-pipe valve clappers shall be left open during test to p vent damage. All
aboveground piping leakage shall be stopped.
PNEUMATIC: Establish40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1/2 psi (0.1 b rs) in 24 hours. Test
pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1-1/ psi (0.1 bars) in 24 hours.
ALL PIPING HYDROSTATICALLY TESTED AT d..:Z5PSI L..-Bar) for ~ HRS.
DRY PIPING PNEUMATICALLY TESTED 0 YES ~O
EQUIPMENT OPERATES PROPERLY t:tY'ES 0 NO
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE C
SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMIC
FOR TESTING SYSTEMS OR STOPPING LEAKS?
ES 0 NO
DRAIN READING OF GAUGE LOCATED NEAR WATER RESIDUAL PRESSUR WITI-j VALVE IN TEST
TEST SUPPLY TEST CONNECTION:~ PSI ( Bar) CONNECTION OPEN IDE(& 6 PSI LBar)
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER EXPLAIN
FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING.
VERIFIED BY COPY OF THE CONTRACTOR'S MATERIAL AND TEST
CERTIFICATE FOR UNDERGROUND PIPING. 0 YES %wo
FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YESJ::LNO
IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS
REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED?~.
glYES ~r NO
NUMBE~SED
WELDED PIPING
LOCATIONS
YES 0 NO
IFYES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING
PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS 82.1?
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS
QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS 82.1?
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS
ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND
OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL
DIAMETERS OF PIPING ARE NOT PENETRATED?
DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL fH'ES
CUTOUTS (DISCS) ARE RETRIEVED?
NAME PLATE-PROVIDED
YES 0 NO
F NO, STATE REASON
f.-; /-\-
EMICALS, SODIUM
LS WERE NOT USED
ONO
ONO
ONO
ONO
DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN:
NAME OF SPRINKLER CONTRACTOR
AHERN FIRE PROTECTION, 201 MORRIS COURT - FOND DU LAC, WI 54935
TESTS WITNESSED BY
ION (SIGNED) TITLE
~ O~~
a~ k- +
SIGNATURES
3
7. -07
DATE
5-)2 u7
DATE
3~ 22-D?
DATE
3- 23 ()7
.;
AHERN FIRE PROTECTION M AR 2 9 2007
-
Contractor's Material and Test Certificate for Aboveground :)iping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's repres ntative. All defects shall be
corrected and system left in service before contractor's personnel finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and c ontractor. It is understood the
owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving
authoritv's requirements or local ordinances.
PROPERTY NAME Baldor Electric AFP Contract #: 490501 I DATE: November 28, 2006
PROPERTY ADDRESS 3815 OreQon Street Oshkosh, VI. I 54902
ACCEPTED BY APPROVING AUTHORITIES (NAMES)
1. Factory Mutual Global (Mr. Kim McCluskey P. E.)
2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky)
3. City of Oshkosh (Building ,Inspector -- Brian Noe)
4.
ADDRESS
Plans 1. W184 N8311 Tours Drive -- Menomonee Falls, WI 53051
2. 101 Court Street -- Oshkosh, WI 54901
3. 215 Church Avenue -- PO Box 1130 -- Oshkosh, WI 54901
4.
INSTALLATION CONFORMS TO ACCEPTED PLANS rB YES ONO
EQUIPMENT USED IS APPROVED yrvES ONO
IF NO, EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION rES ONO
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT?
INSTRUCTIONS IF NO, EXPLAIN
HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: o YES ~O
Item No.'s 2 & 3 will 1. SYSTEM COMPONENTS INSTRUCTION
be forwarded by AFP
at closeout time. 2. CARE AND MAINTENANCE INSTRUCTIONS o YES NO
3. NFPA 25 o YES..E'!' NO
LOCATION OF SUPPLIES BUILDINGS --
SYSTEM System #3
MAKE MODEL YEAR OF K- Q ANTITY TEMPERATURE
MANUFACTURE FACTOR RATING
Vikinq ESFR VK500 Pendent 3/4" Bronze 2006 14.0 434 165 Dec.
SPRINKLERS
PIPE AND TYPE OF PIPE Liahtwall Non-Threadable' Thinwall Threadable
FITTINGS TYPE OF FITTINGS Grooved' Threaded' Welded Outlets' Mechanical Tees
FLOW ALARM DEVICE MAXIMU VI,TIME TO OPERATE
THROUG '-TEST CONNECTION
TYPE MAKE MODEL MIN. SEC.
Water Flow Detector System Sensor WFD , J-/(!)
N/A
EXPLAIN ANY ALARM PROBLEMS:
ALARM
DEVICES LOW AIR ALARM DEVICE ALARM OPERATED
TYPE I ...Mj.\KE MODEL PRJ:SSURf PRO PERL Y
N/A SJ:TTING P I YcfJ..... L.
NO
~ "".,-,
I
gl"'LAIN JlNY JlLA~M ,""~O!!lLEl\jl:~: "<--.
Ahern Fire Protection
CENTRAL MONITORING "
LOCATION(S) SIGNALS REC IVED
ALARM SERVICE
TYPE OR PRESSURE
NAME OF REMOTE WATERFLOW SWITCH LOW-AIR OTHER
SERVICE DETECTOR FLOW S JPERVISORY
- SUPERVISING LOCA TION(S):
STATION X
(ON-SITE) (+0'7
REMOTE REMOTE NAME OF SERVICE:
MONITORING
ALARM SERVICE
SIGNALING (OFF-SITE)
PHONE:
OTHER: LOCATION(S):
,
EXPLAIN ANY ALARM SIGNALING PROBLEMS:
DRY VALVE Q.O.D.
MAKE MODEl SERIAL NO. MAKE MODE SERIAL NO.
TIME TO TRIP WATER TRIP POINT AIR TIMEJDI "TER ALARM
THROUGH TEST AIR PRESSURE ~CHE TEST OPERATED
CONNECTION'.2 PRESSURE PR OUTL T,.2 PROPERLY
DRY PIPE MIN. SEC. PSI 2&1- PSI MIN. SEC. YES NO
OPERATING WITHOUT ~
TEST 0.0.0.
WITH ---- ~
0.0.0.
~~
OPERATION: o PNEUMATIC o ELECTRIC o HYDRAULIC
PIPING SUPERVISED DYES DNO DETECTING MEDIA SUPERVISE) DYES DNO
DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATION~ DYES DNO
-'
IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO, EXe.J..AlN..
DELUGE & CIRCUIT FOR TESTING ~ ~
PREACTION DYES 0 NO
VALVES
~ ~ DOES EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO
OPERATE SUPERVISION OPERATE VALVE RELEASE OPERATE RELEASE
M~ LOSS ALARM
YES NO YES NO MIN. SEC.
LOCATION & -- RESIDUAL P ~ESSURE
FLOOR MAKE & MODEL SETTING ~I"'KESSURE (FLOW NG) FLOW RATE
PRESSURE I.---- INLET OUTLET .INLET OUTLET FLOW
REDUCING ---- (PSI) (PSI) (PSI) " (PSI) (GPM)
VALVE TEST -;;;;;:;:1'"'
1 MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED.
2 NFPA 13 ONLY REOUIRES THE 60-SECONOLlMITATION IN SPECIFIC SECTIONS.
2
i -----~~----
TEST
DESCRIPTION
TESTS
BLANK
TESTING
GASKETS
WELDING
CUTOUTS
(DISCS)
HYDRAULIC
DATA
NAMEPLATE
REMARKS
Ahern Fire Protection
HYDROSTATIC: H \ostatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 ars) above static pressure in
excess of . 10.2 bars) for two hours. Differential dry-pipe valve clappers shall be left open during test to pr vent damage. All
aboveground piping leakage shall be stopped.
PNEUMATIC: Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1/2 psi (0.1 ba s) in 24 hours. Test
pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1-1/ psi (0.1 bars) in 24 hours.
ALL PIPING HYDROSTATICALLY TESTED AT ...2.Z2PSI <-Bar) for --Z..- HRS.
DRY PIPING PNEUMA TICALL Y TESTED 0 YES ~O
EQUIPMENT OPERATES PROPERLY ES 0 NO
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE C
SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMIC
FO TESTING SYSTEMS OR STOPPING LEAKS?
YES 0 NO
"DRAIN READING OF GAUGE LOCATE[) NEAR WATER RESIDUAL PRESSUR WITH VALVE IN TEST
TEST SUPPLY TEST CONNECTION:m PSI ( Bar) CONNECTION OPEN IDE: ~ PSI LBar)
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER EXPLAIN
FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING.
VERIFIED BY COpy OF THE CONTRACTOR'S MATERIAL AND TEST
CERTIFICATE FOR UNDERGROUND PIPING.
FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING
o YES ~O
DYES IDO
I NO, STATE REASON
/0/J-.
EMICALS, SODIUM
LS WERE NOT USED
by
ONO
ONO
ONO
YES
ONO
IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS
REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED?....--
. 0 YE&-[J NO
NUMBER USED
LOCATIONS
IF NO, XPLAIN
SIGNATURES
YES 0 NO
. IF YES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING
PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS
QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS
ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND
OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL
DIAMETERS OF PIPING ARE NOT PENETRATED?
DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL
CUTOUTS (DISCS) ARE RETRIEVED?
NAME PLA~ROVIDED
~YES ONO
DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN:
NAME OF SPRINKLER CONTRACTOR
AHERN FIRE PROTECTION, 201 MORRIS COURT -- FOND DU LAC, WI 54935
TESTS WITNESSED BY
~sl!;!!d;:tSs;.V G JURI DICTION (SIGNE~ ~E d
F~. RTY WN (SI NED) flTLE
-0 ~ jVl
FOR SPRI IT
3
e) FLJ
67
AHERN FIRE PROTECTION
~AR 2 9 2001
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's represer tative. All defects shall be
corrected and system left in service before contractor's personnel finally leave the job.
A certificate shall be filled out and signed by both representatives, Copies shall be prepared for approving authorities, owners, and co tractor. It is understood the
owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure t comply with approving
authoritv's reouirements or local ordinances.
PROPERTY NAME Baldor Electric AFP Contract #: 490501 I DATE: December 6, 2006
PROPERTY ADDRESS 3815 OreQol1 Street Oshkosh, WI 54902
ACCEPTED BY APPROVING AUTHORITIES (NAMES)
1. Factory Mutual Global (Mr. Kim McCluskeyP. E.)
2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky)
3. City of Oshkosh (Building Inspector -- Brian Noe)
4.
ADDRESS
1. W184 N8311 Tours Drive-- Menomonee Falls, WI 53051
2. 101 Court Street -- Oshkosh, WI 54901
3. 215 Church Avenue - PO Box 1130 -- Oshkosh, WI 54901
4.
INSTALLATION CONFORMS TO ACCEPTED PLANS
EQUIP!\IlENT USED IS APPROVED
IF NO, EXPLAIN DEVIATIONS
Plans
-"
g:J YES D NO
rES D NO
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT?
INSTRUCTIONS IF NO, EXPLAIN
~ YES D NO
LOCATION OF
SYSTEM
HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES:
1. SYSTEM COMPONENTS INSTRUCTION
2. CARE AND MAINTENANCE INSTRUCTIONS
3. NFPA 25
SUPPLIES BUILDINGS
System #2 - Canopy
MAKE
.
Vikinc Micromatic M VK200
MODEL
YEAR OF
MANUFACTURE
2006
DYES GJ-'NO
DYES 1211\(0
DYES B"N'0
K- Q' ANTITY TEMPERATURE
FACTOR RATING
8.0 200 286 Dec.
Item No.'s 2 & 3 will
be forwarded by AFP
at closeout time.
Uoricht 3/4" Brass
.
SPRINKLERS
PIPE AND
FITTINGS
TYPE OF PIPE IDOD' Schedule 10' Galvanized
TYPE OF FITTINGS Grooved' Threaded' Welded Outlets
TYPE
Pressure Switch
N/A
EXPLAIN ANY ALARM PROBLEMS:
MAKE
Potter
MODEL
PS10A
MAXIML M TIME TO OPERATE
THROUC H =rEST CONNECTION
MIN. SEC.
3S
FLOW ALARM DEVICE
ALARM
DEVICES
.
.
TYPE
Pressure Switch
LOW AIR ALARM DEVICE
I MAKE
Potter
MODEL
PS40A
PRESSURE
SETTING F SI
ALARM OPERATED
PROPERLY
YES I NO
><:1
EXPLAIN ANY ALARM PROBLEMS:
.
I
,
Ahern Fire Protection
CENTRAL MONITORING SIGNALS RECEI ED
ALARM SERVICE LOCA TION(S)
TYPE OR PRESSURE
NAME OF REMOTE WATERFLOW SWITCH OW-AIR OTHER
SERVICE DETECTOR FLOW SU ERVISORY
SUPERVISING LOCATION(S):
STATION /
(ON~SITE) AOY ;X
) '\
REMOTE REMOTE NAME OF SERVICE:
MONITORING
ALARM SERVICE
SIGNALING (OFF-SITE)
PHONE:
OTHER: LOCATION(S):
EXPLAIN ANY ALARM SIGNALING PROBLEMS:
DRY VALVE Q.O.D.
MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO.
\Id,/ /\!(!- F, I WDodq I q 2~
TIME TO TRIP WATER TRIP POINT AIR TIME WA ER ALARM
THROUGH TEST AIR ~RESSURE REACHED TEST OPERATED
CONNECTION'~ PRESSURE PRESSURE OUTLE 1.2 PROPERLY,
DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO
OPERATING WITHOUT 8~ /(PO L/t\ ""X) 35 vZ
TEST Q.O.D.
WITH
Q.O.D.
IF NO, EXPLAIN:
OPERATION: o PNEUMATIC o ELECTRIC o HYDRAULIC
PIPING SUPERVISED DYES DNO I DETECTING MEDIA SUPERVISE ---rrVES DNO
DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CO~ONS DYES DNO
IS THERE AN ACCESSIBLE FACILITY IN EACH ~
DELUGE & CIRCUIT FOR TESTING
PREACTION DYES DNO ~
VALVES
~CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO
OF' E SUPERVISION OPERATE VALVE RELEASE OPERATE RELEASE
MAKE MODEL LOSS ALARM
~ YES NO YES NO MIN. SEC.
// -
"
LOCATION & MAKE & MODEL SETTING STATIC PRESSURE RESIDUAL P ESSURE FLOW RATE
FLOOR iF'
PRESSURE INLET INLET OUTLET FLOW
REDUCING --(PSI)
VALVE TEST ~ (PSI) . (PSI) (GPM)
~
-
-~
1 MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED.
2 NFPA 13 ONLY REQUIRES THE eO-SECOND LIMITATION IN SPECIFIC SECTIONS.
2 .
"".
Ahern Fire Protection
TEST
DESCRIPTION
HYDR STATIC: ydrostatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3. bars) above static pressure in
excess of si (10.2 bars) for two hours. Differential dry-pipe valve clappers shall be left open during test to revent damage. All
round piping leakage shall be stopped.
PNEUMATIC. Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1/2 psi (0.1 ars) in 24 hours. Test
pressure ta at normal water level and air pressure and measure air pressure drop, which shall not exceed 1- /2 psi (0.1 bars) in 24 hours.
IF NO, STATE REASON
TESTS
ALL PIPING HYDROSTATICALLY TESTED AT ' ~ PSI L-Bar) for _ HRS.
DRY PIPING PNEUMATICALLY TESTED S 0 NO
EQUIPMENT OPERATES PROPERLY YES 0 NO
DO YOU CERTIFY AS THE SPRINKLER CON"'PRACTOR THAT ADDITIVES AND CORROSIVE
SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMI
F. R TESTING SYSTEMS OR STOPPING LEAKS?
S ONO
DRAIN READING OF GAUGE LOCATEIjl.llfiA:R WATER
TEST SUPPLY TEST CONNECTION:-t-L'L PSI ( Bar)
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER
FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING.
HEMICALS, SODIUM
ALS WERE NOT USED
DYES ,Q-1'Ib
OYES~
E WITH VALVE IN TEST
WIDE/l.21:.l. PSI LBar)
OTH R EXPLAIN
VERIFIED BY COPY OF THE CONTRACTOR'S MATERIAL AND TEST
CERTIFICATE FOR UNDERGROUND PIPING.
FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING
~
7
IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS
REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED?
o YEs-E:!'""NO
BLANK
TESTING
GASKETS
LOCATIONS
IF YES...
WELDING
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING
PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS 82.1?
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS
QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS
ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND
OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL
DIAMETERS OF PIPING ARE NOT PENETRATED?
ONO
ONO
ONO
CUTOUTS
(DISCS)
HYDRAULIC
DATA
NAMEPLATE
REMARKS
DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL
CUTOUTS (DISCS) ARE RETRIEVED?
NAME PLATE,PROVIDED
YES 0 NO
DNO
SIGNATURES
{j F,(J
t ~\,+
a7
3
AHERN FIRE PROTECTION IMI ~~ 2 9 20~1
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's repre entative. All defects shall be
corrected and system left in service before contractor's personnel finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the
owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failur to comply with approving
authority's requirements or local ordinances.
PROPERTY NAME Baldor Electric AFP Contract #: 490501 I DA1E: November 28, 2006
PROPERTY ADDRESS 3815 Oreqon Street . Oshkosh,\! ~I 54902
ACCEPTED BY APPROVING AUTHORITIES (NAMES)
1. Factory Mutual Global (Mr. Kim McCluskey P. E.)
2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky)
3. City of Oshkosh (Building Inspector -- Brian Noe)
4.
ADDRESS
Plans 1. W184 N8311 Tours Drive -- Menomonee Falls, WI 53051
2. 101 Court Street -- Oshkosh, WI. 54901
3. 215 Church Avenue -- PO Box 1130 -- Oshkosh, WI 54901
4. ..
INSTALLATION CONFORMS TO ACCEPTED PLANS ~~S ONO
EQUIPMENT USED IS APPROVED I YES ONO
IF NO, EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION pYES ONO
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT?
INSTRUCTIONS IF NO, EXPLAIN
HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES:
Item No.'s 2 & 3 will 1. SYSTEM COMPONENTS INSTRUCTION o YES ~7~O
be forwarded by AFP
at closeout time. 2. CARE AND MAINTENANCE INSTRUCTIONS o YES :{::~
3. NFPA 25 DYES () 0
LOCATION OF SUPPLIES BUILDINGS
SYSTEM System #5
MAKE MODEL YEAR OF K- ( UANTITY TEMPERATURE
MANUFACTURE FACTOR RATING
Viking Micromatic M VK200 Upright 3/4" Bronze 2006 8.0 290 286 Deg.
Viking Microfast M QR VK302 Pendent 1/2" Chrome 2006 5.6 4 155 Deg.
Vikina Micromatic M VK1 04 Horizontal Sidewall 1/2" Brz. 2006 5.6 5 286 Deg.
SPRINKLERS
PIPE AND TYPE OF PIPE Liahtwall Non-Threadable' Thinwall Threadable
FITTINGS TYPE OF FITTINGS Grooved' Threaded' Welded Outlets' Mechanical Tees
FLOW ALARM DEVICE MAXIM JM TIME TO OPERATE
THROU 3H'TEST CONNECTION
TYPE MAKE MODEL MIN, SEC.
Water Flow Detector System Sensor WFD - 'hi
N/A
EXPLAIN ANY ALARM PROBLEMS:
ALARM
DEVICES LOW AIR ALARM DEVICE PRESSUI E ALARM OPERATED
TYPE MAKE MODEL PROPERLY
SETTING SI I
N/A YES NO
I
EXPLAIN ANY ALARM PROBLEMS: .
.
------.---
Ahern Fire Protection
CENTRAL MONITORING SIGNALS RECE IVED
ALARM SERVICE LOCA TION(S) "
TYPE OR PRESSURE
NAME OF REMOTE WATERFLOW SWITCH LOW-AIR OTHER
SERVICE DETECTOR FLOW S PERVISORY
SUPERVISING LOCATION(S):
STATION 'A
(ON-SITE) ,t}O-r-
REMOTE REMOTE NAME OF SERVICE:
MONITORING
ALARM SERVICE
SIGNALING (OFF-SITE)
PHONE:
OTHER: LOCATION(S):
EXPLAIN ANY ALARM SIGNALING PROBLEMS:
"
DRY VALVE O.O.C.
MAKE MODEL SERIAL NO. MAKE MODE SERIAL NO.
TIME TO TRIP WATER TRIP POINT AIR TIME V ATfR.... ALARM
THROUGH TEST PRESSURE AIR PRESSURE PRESSUR~ R TEST OPERATED
CONNECTION". .......... OUT T 1.. PROPERLY
DRY PIPE MIN. SEC. PSI PSI - SI MIN. SEC. YES NO
OPERATING WITHOUT ----
TEST Q.O.D. -
WITH ~
Q.O.D. -
- ~
OPERATION: o PNEUMATIC o ELECTRIC o HYDRAULIC
PIPING SUPERVISED DYES DNO DETECTING MEDIA SUP DYES DNO
-,- --
DOES VALVE OPERATE FROM THE MANUAL TRIP, REMO~ I IJONTROL STATIOI' S DYES DNO
IS THERE AN ACCESSIBLE FACILITY ~ IF NO, EXPLAIN
DELUGE & CIRCUIT FOR TESTING
PREACTION ~-DNO
VALVES
V-- DOES EACH CIRCUIT . DOES EACH CIRCUIT MAXIMUM TIME TO
~ OPERATE SUPERVISION
MODEL LOSS ALARM OPERATE VALVE RELEASE PPERATE RELEASE
~ YES NO YES NO MIN. SEC.
.
'.
LOCATION & MAKE & MODEL. SEI -s"fAiiCPRESSURE RESIDUAL PRESSURE FLOW RATE
PRESSURE FLOOR (FLO 'ING)
REDUCING ~ INLET OUTLET . INLET OUTLET FLOW
--- (PSI) (PSI) (PSI) .. (PSI) (GPM)
VALVE TEST -
."
.-
, MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED.
· NFPA 13 ONLY REQUIRES THE 60-SECOND liMITATION IN SPECIFIC SECTIONS.
2
""
,
'->.
YDROSTA TI . Hydrostatic tests shall,be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 ars) above static pressure in
excess psi (10.2 bars) for two hours, Differential dry-pipe valve clappers shall be left open during test to pr vent damage. All
oveground piping leakage shall be stopped,
PNEUMATIC: Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1/2 psi (0.1 b rs) in 24 hours. Test
pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1-1/ psi (0,1 bars) in 24 hours.
ALL PIPING HYDROSTATICALLY TESTED AT -
DRY PIPING PNEUMATICALLY TESTED
EQUIPMENT OPERATES PROPERLY S 0 NO
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE C
SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMIC
F R TESTING SYSTEMS OR STOPPING LEAKS?
~ES 0 NO
DRAIN READING OF GAUGE LOCATED NEAR WATER
TEST SUPPLY TEST CONNECTION:ili PSI ( Bar)
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER
FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING.
Ahern Fire Protection
TEST
DESCRIPTION
TESTS
VERIFIED BY COpy OF THE CONTRACTOR'S MATERIAL AND TEST
CERTIFICATE FOR UNDERGROUND PIPING. . 0 YES ~O
FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YES~O
IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS
REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED?
o YE~O
BLANK
TESTING
GASKETS
NUMBEB USED
LOCATIONS
WELDED PIPING 0 NO
. IFYES...
WELDING
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING
PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS
QUALIFIED IN COMPLIANCE WITH THE REQUIReMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS
ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND
OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL
DIAMETERS OF PIPING ARE NOT PENETRATED?
CUTOUTS
(DISCS)
HYDRAULIC
DATA
NAMEPLATE
REMARKS
DO YOU CERTIFY THAT YOU HAVE 'A CONTROL FEATURE TO ENSURE THAT ALL
CUTOUTS (DISCS) ARE RETRIEVED?
NAME PLATE PROVIDED
~ES 0 NO
SIGNATURES
of/J
3
!V()-
EMICALS, SODIUM
LS WERE NOT USED
WITfi VALVE IN TEST
IDEJ&6 PSI LBar)
EXPLAIN
ONO
ONO
ONO
~ S DNO
IF N ,EXPLAIN
"3 z..3~O
_ DATE
3-'L'G-07
, DATE
5-2- 2. -(} ')
DATE
3- 23- 07
AHERN FIRE PROTECTION UAR 2 9 2001
. ..
Contractor's Material and Test Certificate for Aboveground Piping '. .
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's repre s ntative. All defects shall be
corrected and system left in service before contractor's personnel finally leave the job.
. A pertificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and ontractor. It is understood the
owner's representative's signature in no way prejudices any claim against contractor for faulty,material, poor workmanship, or failure to comply with approving
authority's reauirements or local ordinances.
PROPERTY NAME Baldor Electric AFP Contract #: 490501 I DAT : November 28, 2006
PROPERTY ADDRESS 3815 OreQon Street Oshkosh, \f1 I 54902
ACCEPTED BY APPROVING AUTHORITIES (NAMES)
1. Factory Mutual Global (Mr. Kim McCluskey p, E.)
2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky)
3. . City of Oshkosh (Building Inspector -- Brian Noe)
4.
ADDRESS
Plans 1. W184 N8311 Tours Drive -- Menomonee Falls, WI 53051
2. 101 Court Street -- Oshkosh; WI 54$01
3, 215 Church Avenue -- PO Box 1130 -- Oshkosh, WI 54901
4.
INSTALLATION CONFORMS TO ACCEPTED PLANS ..--ErYES DNO
EQUIPMENT USED IS APPROVED ,Z?ES DNO
IF NO, EXPLAIN DEVIATIONS
-
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION 1"0 YES DNO
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT?
INSTRUCTIONS IF NO, EXPLAIN
HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES:
Item No.'s 2 & 3 will t. SYSTEM COMPONENTS INSTRUCTION DYES E1'fo
be forwarded by AFP
at closeout time. 2. CARE AND MAINTENANCE INSTRUCTIONS DYES ~
3. NFPA 25 DYES 0
LOCATION OF SUPPLIES BUILDINGS
SYSTEM Fire Pump .
MAKE MODEL YEAR OF K- ( UANTITY TEMPERATURE
MANUFACTURE FACTOR RATING
N/A
SPRINKLERS
PIPE AND TYPE OF PIPE Liahtwall Non-Threadable' Thinwall Threadable' Schedule 10
FITTINGS TYPE OF FITTINGS Flanned' Grooved' Threaded' Welded Outlets' Mechanical Te s
FLOW ALARM DEVICE MAXIM JM TIME TO OPERATE
THROU 3HTEST CONNECTION
TYPE MAKE MODEL MIN. SEC.
N/A
." N/A
EXPLAIN ANY ALARM PROBLEMS: .
ALARM
DEVICES LOW AIR ALARM DEVICE . ALARM OPERATED
TYPE MAKE MODEL PRESSU E PROPERLY
SETTING )SI
. N/A I YES I NO
I.
EXPLAIN ANY ALARM PROBLEMS:
i
REMOTE
ALARM
SIGNALING
DRY PIPE
OPERATING
TEST
DELUGE &
PREACTION
VALVES
'..
PRESSURE
REDUCING
VALVE TEST
ALARM SERVICE
TYPE
Ahern Fire Protection
CENTRAL MONITORING
LOCATION(S)
OR
NAME OF REMOTE WATERFLOW
SERVICE DETECTOR
LOCATION(S):
LOW-AIR
SUPERVISORY
SIGNALS RECEIVED
PRESSURE
SWITCH
FLOW
SUPERVISING
STATION
(ON-SITE)
4D1
NAME 01= SERVICE:
REMOTE
MONITORING
SERVICE
(OFF-SITE)
OTHER:
PHONE:
LOCATION(S):
EXPLAIN ANY ALARM SIGNALING PROBLEMS:
MAKE
DRY VALVE
MODEL
MAKE
a.o.).
MOD L
SERIAL NO.
TIME TO TRIP
THROUGH TEST
CONNECTION,,2
AIR PRESSURE
TRIP POINT AIR
PRESSURE
P.BJ....--
TIME I\IATER
REACH D TEST
_'O{Jr ET 1,2
MIN. SEC.
I
WATER
PRESSURE
MIN. SEC. PSI
PSI
WITHOUT
Q.O.D.
WITH
Q.O.D.
IFNO~
OPERATION: 0 PNEUMATIC
--- --
----
o ELECTRIC
o HYDRAULIC
PIPING SUPERVISED 0 YES 0 NO DETECTING MEDIA SUPERVIS 0
DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATIOt-,S
IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO. EXPLAIN
CIRCUIT FOR TESTING I ~
o YE;S.. 0 NO ,"oN.l..--~"'-- . .
QeEa~-elMUiT DOES EACH CIRCUIT
~TE SUPERVISION OPERATE VALVE RELEASE
MAKE ~ LOSS ALARM
"....... YES. NO
-
-"
OTHER.
ylA""rn&
1\ (~
'7u1'" 0'
~S\0' I
SERIAL NO.
ALARM
OPERATED
PROPERL Y
YES NO
DYES 0 NO
DYES 0 NO
MAXIMUM TIME TO
OPERATE RELEASE
YES
NO
MIN.
LOCATION &
FLOOR
MAKE & MODEL SETTI~ l-s1*TrcPRESSURE
___~ INLET OUTLET
(PSI) (PSI)
RESIDUAL RESSURE
(FLO\ ING)
. INLET OUTLET
(PSI) (PSI)
1---
1 MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED.
2 NFPA 13 ONLY REQUIRES THE 60.SECOND LIMITATION IN SPECIFIC SECTIONS,
2
:
SEC.
FLOW RATE
FLOW
(GPM)
....
.
Ahern Fire Protection
HYDROSTATIC:,-Aydrostatictests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3. bars) above static pressure in
excess psi (10.2 bars) for two hours. Differential dry-pipe valve clappers shall be left open during test to revent damage. All
oveground piping leakage shall be stopped.
PNEUMATIC: Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1/2 psi (0.1 ars) in 24 hours. Test
pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1- /2 psi (0.1 bars) in 24 hours.
TEST
DESCRIPTION
ALL PIPING HYDROSTA TICALL Y TESTED AT ~ PSI <-Bar) for --2- HRS.
DRY PIPING PNEUMA TICALL Y TESTED VO Y'ES ~O
EQUIPMENT OPERATES PROPERLY ~S 0 NO I
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE
SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMI
FOR ESTING SYSTEMS OR STOPPING LEAKS?
YES 0 NO
DRAIN READING OF GAUGE LOCATED NEAR WATER
TEST SUPPLY TEST CONNECTION:11Y PSI ( Bar)
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER
FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING.
VERIFIED BY COPY OF THE CONTRACTOR'S MATERIAL AND TEST
CERTIFICATE FOR UNDERGROUND PIPING. 0 YES fa1\f0
FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YES ~
IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS
REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPL.t:TED?~
o YESp NO
IF NO, STATE REASON
/lfi4-
HEMICALS, SODIUM
ALS WERE NOT USED
E WITH VALVE IN TEST
WIDE: J..ti;D... PSI LBar)
R EXPLAIN
TESTS
by
-t'r"',
BLANK
TESTING
GASKETS
NUMBER USED LOCATIONS
o
WELDED PIPING YES 0 NO
IF YES...
pYS ONO
,PtY S DNO
~S DNO
,
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING
PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS
QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS
ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND
OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL
DIAMETERS OF PIPING ARE NOT PENETRATED?
WELDING
CUTOUTS
(DISCS)
HYDRAULIC
DATA
NAMEPLATE
REMARKS
DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL
CUTOUTS (DISCS) ARE RETRIEVED?
NAME PLA1-E PROVIDED
( 0 YES 0 NO
DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN:
NAME OF SPRINKLER CONTRACTOR
AHERN FIRE PROTECTION, 201 MORRIS COURT -- FOND DU LAC, WI 54935
TESTS WITNESSED BY
VIN'URIS~ICTION (SIGNED) TITLE
. If'- V ~M ~ 4. ~&i.t~-f-
WNER (SIGNEO) TIT!.
ONO
. DATE
'3 - 2'2 -0'1-.
DATE
3