Loading...
HomeMy WebLinkAbout0124002-Building o OSHKOSH ON THE WATER Job Address 914 OTTER AVE CITY OF OSHKOSH No 124002 BUILDING PERMIT - APPLICATION AND RECORD Owner ADAM EITABITHA E LAJOIE C eate Date 04/02/2007 Designer Contractor OWNER Category 140 - Interior Remodeling PI n Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature FRI Kitchen Remodel *Gutting the kitchen and installing new insulation, drywall, cabinets, countertops, and fl ring. A new window will of Work Iso be installed. HV AC Contractor Plumbing Contractor HOMEOWNER Electric Contractor HOMEOWNER Fees: valu~ Issued By: " $5,300.00 Plan Approval $0.00 Permit Fee Paid $60.00 Park De ication $0.00 Date 04/02/2007 Final/D.P. 00/00/0000 D Permit Voided I Parcelld # 0203100000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the ork described in this permit application within an easement, the City strongly urges the permit applicant to contact the ease ent holder(s) and to secure any sary approvals before starting such activity. Signature ,1 e entlOwner Address OSHKOSH WI 54901 - 5445 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Per it Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), y ur Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is re eived. Work may continue if the inspection is not performed within two business days from the time the project is rea y.