HomeMy WebLinkAbout0123990-Plumbing (laterals)
e
OSHKOSH
ON THE WATER
Job Address 834 KEENVILLE LN
CITY OF OSHKOSH
No 123990
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor VINTON CONSTRUCTION CO
Category 401 - Residential-Exterior (laterals)
Create Date 03/30/2007
Plan
Owner DEWEY HOMES INC
Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker
- - - - - -
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap
- - - - - -
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
- - - - - -
Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
- - - - - -
Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
- - - - - -
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
- - - - - -
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
- - - - - -
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
- - - - - -
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
- - - - -
Misc.
Fixtures -
Use/Nature Install sanitary sewer and water laterals for SFR lot.
of Work
Size
Material
Plastic
Type
Lateral
# Conn. Type
1 New
Sanitary Sewer
4"
Storm Sewer
Water Service
1"
Copper
Lateral
1 New
Parcel Id #
1550010000
Valuation
$3,000.00 Plan Approval
$0.00 Permit Fees
$100.00 0 Permit Voided
Issued By
Date 03/30/2007
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the w rk
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement hJf#-older(S) nd to secure an~ approvals before starting such activity.
Signature ~ tv~
Agent/Owner
Address POBOX 1987 MANITOWOC
Date
3-3D-07
WI 54221 - 1987
Telephone Number
920-374-0227
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Per nit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), ~ our Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is r ceived. Work may
continue if the inspection is not performed within two business days from the time the project is rea y.