Loading...
HomeMy WebLinkAbout0123990-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 834 KEENVILLE LN CITY OF OSHKOSH No 123990 PLUMBING PERMIT - APPLICATION AND RECORD Contractor VINTON CONSTRUCTION CO Category 401 - Residential-Exterior (laterals) Create Date 03/30/2007 Plan Owner DEWEY HOMES INC Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker - - - - - - Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap - - - - - - Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - - - - - - Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve - - - - - - Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn - - - - - - Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs - - - - - - Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters - - - - - - Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs - - - - - - Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp - - - - - Misc. Fixtures - Use/Nature Install sanitary sewer and water laterals for SFR lot. of Work Size Material Plastic Type Lateral # Conn. Type 1 New Sanitary Sewer 4" Storm Sewer Water Service 1" Copper Lateral 1 New Parcel Id # 1550010000 Valuation $3,000.00 Plan Approval $0.00 Permit Fees $100.00 0 Permit Voided Issued By Date 03/30/2007 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the w rk described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hJf#-older(S) nd to secure an~ approvals before starting such activity. Signature ~ tv~ Agent/Owner Address POBOX 1987 MANITOWOC Date 3-3D-07 WI 54221 - 1987 Telephone Number 920-374-0227 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Per nit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), ~ our Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is r ceived. Work may continue if the inspection is not performed within two business days from the time the project is rea y.