HomeMy WebLinkAbout0123991-Plumbing (laterals)
G
OSHKOSH
ON THE WATER
Job Address 844 KEENVILLE LN
CITY OF OSHKOSH
No
123991
PLUMBING PERMIT - APPLICATION AND RECORD
Owner
Create Date 03/30/2007
Contractor VINTON CONSTRUCTION CO
Category 401 - Residential-Exterior (laterals)
Pan
Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker
- - - - - -
Whirlpool Floor Drain Local Waste - Ice Chest Flr/Wst Sink Int Grease Trap
- - - - -
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
- - - - - -
Toilet Disposal Bidet - Sculry Sink Wash Ftn RPZ Valve
- - - - -
Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
- - - - - -
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
- - - - - -
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
- - - - - -
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
- - - - - -
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
- - - - -
Misc.
Fixtures -
Use/Nature Install sanitary sewer and water laterals for SFR lot.
of Work
Size
Material
Plastic
Type
Lateral
# Conn. Type
1 New
Sanitary Sewer
4"
Storm Sewer
Water Service
1"
Copper
Lateral
1 New
Parcelld #
Valuation
$2,000.00 Plan Approval
$0.00 Permit Fees
$100.00 0 Permit Voided
Issued By
Date 03/30/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the w rk
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement hOld~ and to secur~ any~ry approvals before starting such activity.
Signature ~ W~ Date s-.3o-07
(/ (J AgenUOwner
Address POBOX 1987
MANITOWOC
WI 54221 - 1987 Telephone Number 920-374-0227
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Per nit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), y)ur Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is rI ceived. Work may
continue if the inspection is not performed within two business days from the time the project is rea y.