Loading...
HomeMy WebLinkAbout0123993-Plumbing (laterals) \ "" r CITY OF OSHKOSH No 123993 o OSHKOSH ON THE WATER Job Address 864 KEENVILLE LN PLUMBING PERMIT -APPLICATION AND RECORD Contractor VINTON CONSTRUCTION CO Category 401 - Residential-Exterior (laterals) Owner HUISMAN HOMES LLC reate Date 03/30/2007 Ian Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature Install sanitary sewer and water laterals for SFR lot. of Work Size Material Plastic Type Lateral # Conn. Typ New Sanitary Sewer 4" Storm Sewer Water Service 1" Copper Lateral New Valuation $3,500.00 Plan Approval $0.00 $100.00 D PermitVoide Permit Fees Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s nd to secure any necessary approvals before starting such activity. ~ Signature Agent/Owner MANITOWOC WI 54221 - 1987 Telephone Number 920-374-0227 Address POBOX 1987 Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Parcelld # 1550010300 Date 03/30/2007 Date 3-3C-07 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Pe it Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), our Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is r ceived. Work may continue if the inspection is not performed within two business days from the time the project is rea y.