HomeMy WebLinkAbout0123993-Plumbing (laterals)
\ "" r
CITY OF OSHKOSH No 123993
o
OSHKOSH
ON THE WATER
Job Address 864 KEENVILLE LN
PLUMBING PERMIT -APPLICATION AND RECORD
Contractor VINTON CONSTRUCTION CO
Category 401 - Residential-Exterior (laterals)
Owner HUISMAN HOMES LLC reate Date 03/30/2007
Ian
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature Install sanitary sewer and water laterals for SFR lot.
of Work
Size
Material
Plastic
Type
Lateral
#
Conn. Typ
New
Sanitary Sewer
4"
Storm Sewer
Water Service
1"
Copper
Lateral
New
Valuation
$3,500.00
Plan Approval
$0.00
$100.00 D PermitVoide
Permit Fees
Issued By
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s nd to secure any necessary approvals before starting such activity.
~
Signature
Agent/Owner
MANITOWOC
WI 54221 - 1987 Telephone Number 920-374-0227
Address POBOX 1987
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Parcelld #
1550010300
Date 03/30/2007
Date
3-3C-07
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Pe it Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), our Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is r ceived. Work may
continue if the inspection is not performed within two business days from the time the project is rea y.