HomeMy WebLinkAbout2007-Building (raze garage)
CITY OF OSHKOSH No 123983
G
OSHKOSH
ON THE WATER
Job Address 555 557 PLEASANT ST
BUILDING PERMIT - APPLICATION AND RECORD
Designer
Contractor LETT SIDING & TRIM
Owner RONALD D LETT C ate Date 03/29/2007
Category
149 - Raze detached garage, construct detached garage
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Unfinished/Basement Sq. Ft.
Height Ft.
Rooms
Finished/Living
Bedrooms
Stories
Sq.Ft.
Sq.Ft.
Baths
Garage
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
UselNature DUP\ Raze garage, to rebuild in the future.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,000.00 Plan Approval ________~Q_=.Q2 Permit Fee Paid
$25.00 Park De ication
Final/O.P. 00/00/0000
_____ "'U______.____.
$0.00
Issued By:
Date 03/29/2007
Parcelld # 0402980000
o Permit Voided I
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the ork
described in this permit application within an easement, the City strongly urges the permit applicant to contact the ease ent
holder(s) and to s, e any nee sary ap ovals before starting such activity.
Signature I ~ Date
Agent/Owner
PI n
Size
____.-J
o Projection I
Canopies
Signs
o
Address 5737 CLEVEDON LN
OSHKOSH
WI 54904 - 97?~__ Telephone Number 920-233-4144
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Per it Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), y ur Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is r ceived. Work may
continue if the inspection is not performed within two business days from the time the project is rea y.