Loading...
HomeMy WebLinkAbout0123985-Building o OSHKOSH ON THE WATER Job Address 2704 JACKSON ST CITY OF OSHKOSH No 123985 BUILDING PERMIT - APPLICATION AND RECORD Owner HIS CHURCH WORLD OUTREACH INC Cr ate Date 03/28/2007 Designer Dale Nelson Contractor CONSOLIDATED CONST Category 208 - Alteration Churches & other Religious PI n X8-1941-0307 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: 3B Unfinished/Basement Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies - Garage Sq. Ft. Baths Signs - Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not R quired Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature Church /Interior alterations as per plans to create accessible restrooms, and reconfigure office space as per pi n. of Work HV AC Contractor Plumbing Contractor Electric Contractor $0.00 Permit Fee Paid $88.00 Park Dedication $0.00 Issued By: Date 03/29/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1519600100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the ork described in this permit application within an easement, the City strongly urges the permit applicant to contact the ease ent holder(s) and to y necessary approvals befo e starting such activity. Date :3 (-;:<q ~~7 Signature Address OSHKOSH WI 54901 - 1514 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Per it Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), y ur Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is r ceived. Work may continue if the inspection is not performed within two business days from the time the project is rea y.