Loading...
HomeMy WebLinkAbout0123955-Building (crawlspace) e OSHKOSH ON THE WATER Job Address 1917 SIMPSON ST CITY OF OSHKOSH No 123955 BUILDING PERMIT - APPLICATION AND RECORD Owner LYNN A/PATRICIA K KRAUS C ate Date 03/27/2007 Designer Contractor OWNER Category 140 -Interior Remodeling PI n Type . Building o Sign o Canopy Class of Const: o Fence o Raze Zoning Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq. Ft. Sq. Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRI Pouring a slab in the crawlspace* 6 mil plasitic will be installed under the slab. Affordable Concrete will b doing the work. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $400.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedi ation $0.00 Issued By: ~ Date 03/27/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1409340000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the rk described in this permit application within an easement, the City strongly urges the permit applicant to contact the easem nt holder(s) and to cure Cjn necessary approvals before starting such activity. Date Signature Address 1917 SIMPSON ST Agent/Owner OSHKOSH WI 54902 - 6844 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permi Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), you Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is rec ived. Work may continue if the inspection is not performed within two business days from the time the project is ready.