Loading...
HomeMy WebLinkAbout0123922-Building (above grade) CITY OF OSHKOSH No 123922 o OSHKOSH ON THE WATER Job Address 729 SIEWERT TRL BUILDING PERMIT - APPLICATION AND RECORD Designer Thomas Karrels Contractor OWNER Owner CITY OF OSHKOSH (PARKS) CrE ate Date 03/26/2007 Category 261 - City of Oshkosh-Addition Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: VB Unfinished/Basement Sq. Ft. Height Ft. Rooms Finished/Living Sq. Ft. Sq. Ft. Bedrooms Stories Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not RE quired Park Dedication Not Required # Dwelling Units o # Structures Use/Nature City/ Above Grade Permit - Construction of addition to storage building as per plans of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $53,000.00 Plan Approval $0.00 Permit Fee Paid $0.00 Park Dedi ation Issued By: Date 03/26/2007 D Permit Voided I In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the ~ ork described in this permit application within an easement, the City strongly urges the permit applicant to contact the easem nt holder(s) and to secure any necessary approvals before starting such activity. Signature Address PO BOX 1130 Agent/Owner OSHKOSH Telephone Number WI 54903 - 1130 Date Pia 11 X4-1926-0307 I Size D Projection I Canopies Signs o $0.00 Final/O.P. 00/00/0000 Parcel Id # MAINTENANCE GAF To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Perrr it Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), YOllr Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is rec eived. Work may continue if the inspection is not performed within two business days from the time the project is read .