Loading...
HomeMy WebLinkAbout2007-Plumbing (hook-ups) o OSHKOSH ON THE WATER Job Address 1930 aMRa RD CITY OF OSHKOSH No 123934 PLUMBING PERMIT - APPLICATION AND RECORD Contractor J RASMUSSEN PLUMBING INC Shower Owner 1930 aMRa RD LLC reate Date 03/26/2007 Category 440 - Industrial-Interior Ian Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr 1 Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Install clothes washer hook ups in kitchen area. of Work Valuation Issued By Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1610970000 $200.00 Plan Approval $0.00 Permit Fees $25.00 0 Permit Voided Date 03/26/2007 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the w rk described in this permit applicati ithin an easement, the City strongly urges the permit applicant to contact the easement holder(s) d to se r ny necessary approvals before starting such activity. Signature Date J - ~ tv .... 0 7 Agent/Owner Address 1914 GREENBRIAR TRL OSHKOSH WI 54904 - 0000 Telephone Number 920-233-6747 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Per it Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), y ur Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is re ived. Work may continue if the inspection is not performed within two business days from the time the project is rea y.