HomeMy WebLinkAbout2007-Building (floor)
o
OSHKOSH
ON THE WATER
Job Address 436 N MAIN ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RE~ORD
Owner JEROME C RATCHMAN
Designer
Contractor
DAN V BINDER CONSTRUCTION
Category
232 - Alteration Stores & Customer Service
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Unfinished/Basement
Sq. Ft.
Height
Ft.
Rooms
Finished/Living
Sq. Ft.
Sq. Ft.
Bedrooms
Stories
Baths
Garage
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
Use/Nature Comm/ Repair a section of the floor'. All work shall comply with applicable codes.
of Work
HV AC Contractor
Plumbing Contractor
!
$25.00 Park Dedication $0.00
I
Date 03/23/2007 I Final/O.P. DO/DO/DODO
1 Parcelld # 0400980000
1
i
In the performance of this work I agree to perform all work pursuant to rules governing the described construction. 1
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the %rk
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easemknt
holder(s) and to secure any necessary approvals before starting such activity. I
I
Date!
,
I
WI 54902 - 0000 Telephone Number : 231-2114
!
!
1
j
I
Electric Contractor
Fees: Valuation
$1,000.00
$0.00 Permit Fee Paid
Plan Approval
Issued By:
w
o Permit Voided I
Signature
AgenUOwner
Address
1224 W SOUTH PARK AVE
OSHKOSH
,
,
1
j
I
I
I
-L
i
! No
I
t
I
I
Cr~ate Date
I
,
123899
03/23/2007
I
PI~n
i
I
I
Size
I
i
I
1
o Projection I
Canopies
Signs
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), y~ur Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is re~eived. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
1
i