Loading...
HomeMy WebLinkAbout2007-Building (floor) o OSHKOSH ON THE WATER Job Address 436 N MAIN ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RE~ORD Owner JEROME C RATCHMAN Designer Contractor DAN V BINDER CONSTRUCTION Category 232 - Alteration Stores & Customer Service Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Unfinished/Basement Sq. Ft. Height Ft. Rooms Finished/Living Sq. Ft. Sq. Ft. Bedrooms Stories Baths Garage Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures Use/Nature Comm/ Repair a section of the floor'. All work shall comply with applicable codes. of Work HV AC Contractor Plumbing Contractor ! $25.00 Park Dedication $0.00 I Date 03/23/2007 I Final/O.P. DO/DO/DODO 1 Parcelld # 0400980000 1 i In the performance of this work I agree to perform all work pursuant to rules governing the described construction. 1 While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the %rk described in this permit application within an easement, the City strongly urges the permit applicant to contact the easemknt holder(s) and to secure any necessary approvals before starting such activity. I I Date! , I WI 54902 - 0000 Telephone Number : 231-2114 ! ! 1 j I Electric Contractor Fees: Valuation $1,000.00 $0.00 Permit Fee Paid Plan Approval Issued By: w o Permit Voided I Signature AgenUOwner Address 1224 W SOUTH PARK AVE OSHKOSH , , 1 j I I I -L i ! No I t I I Cr~ate Date I , 123899 03/23/2007 I PI~n i I I Size I i I 1 o Projection I Canopies Signs To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), y~ur Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is re~eived. Work may continue if the inspection is not performed within two business days from the time the project is ready. 1 i