HomeMy WebLinkAboutBuilding 1374191 (3/19/07)
';0::::"'-
... j, commerce.wi.gov
~i!~go~!Je!:!
Safety and Buildings
1340 E GREEN BAY ST STE 300
SHAWANO WI 54166
TOO #: (608) 264-8777
Www.commerce.wi.gov/sb/
www.wisconsin.gov
,..
Jim Doyle, Governor
Mary P. Burke, Secretary
March 19, 2007
CUST ID No. 132425
ATTN: Buildings & Structures Building Inspector
JEFFREY OLENICZAK
MONROE EQUIPMENT INC
N50 W13941 OVERVIEW DR
MENOMONEE FALLS WI 53051
BUILDING INSPECTION
CITY OF OSHKOSH
POB 1130
OSHKOSH WI 54902
(Please forward a copy of this letter to thejire
department conducting inspections of this project.)
CONDITIONAL APPROVAL
PLAN APPROVAL EXPIRES: 03/19/2008
SITE:
UW Oshkosh Titan Stadium
450 Josslyn St
City of Oshkosh, 54901
; Fire Dept ID: 7003
FOR:
Facility: 643917 UW OSHKOSH TITAN BASEBALL STADIUM
450 JOSSL YN ST
OSHKOSH 54901
Tenant Name or AddnlAlt Description: UW OSHKOSH TITAN STADIUM
Object Type: HV AC ICC System Regulated Object ID No.: 1120235
7,000 sq ft Area Heated
The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes
and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in
chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements.
The following conditions shall be met during construction or installation and prior to occupancy or use:
Key Items
. IMC 401lComm 64.0401(4)(a)2. Provide outside air intake openings a minimum of 12 inches vertically from
the adjoining grade level, above adjoining roof surfaces, or above the bottom of an areaway. Outside air intake
Can not open to. a4jacent enclosed room. L-I for HRV -I shown 00 the plan ;s located mn c~E'ften} E D
room 114. Outside air intake shall open to the exterior. r\. . I V
. IMC 403/Comm 64.0403 Provide minimum mechanical exhaust in the amount of 0.50 cfinls ofe loc er
room. See Comm Table 64.0403.
Reminders
. mCl101.2/ANSI A1l7.1-308.2 & 3 Mechanical system controls shall be located a maximuxeEPMif~NT OF
and a minimum of 15 inches above the finished floor, immaterial of whether or not the ~MIftVvDf:VELOPMENT
forward approach by a wheel chair or if the clear floor space allows a parallel approach.
MAR 2 " ~ 007
. Comm 61.36(1)(a) & (b) This approval will expire 2 years after the date of approval of the building plans if the
building shell is not closed in within those 2 years. Also, this approval will expire 3 years after the date of
...
JEFFREY OLENICZAK
Page 2
3/19/2007
building plan approval if the work covered by this approval is not completed and the building ready for
occupancy within those 3 years.
A copy of the approved plans, specifications and this letter shall be on-site during construction and open to
inspection by authorized representatives of the Department, which may include local inspectors. Ifplan index sheets
were submitted in lieu of additional full plansets, a copy of this approval letter and index sheet shall be attached to
plans that correspond with the copy on file with the Department. All permits required by the state or the local
municipality shall be obtained prior to commencement of construction/installation/operation. If this construction
project will disturb one or more acres ofland, an Erosion Control Notice ofIntent (NOI) shall be filed with the
department 14 days prior to any earth disturbing activities.
In granting this approval the Division of Safety & Buildings reserves the right to require changes or additions should
conditions arise making them necessary for code compliance. As per state stats1 0 1.12(2), nothing in this review
shall relieve the designer of the responsibility for designing a safe building, structure, or component.
Inquiries concerning this correspondence may be made to me at the telephone number listed below, or at the address
on this letterhead.
SjOL~
Fee Required $
Fee Received $
Balance Due $
320.00
320.00
0.00
Adam S Muliawan
Engineering Consultant, Integrated Services
(715)526-9019, M-r 7:00-4:30; F 7:00-11:20
adam.muliawan@wisconsin.gov
cc: Peter R Ochs, State Building Inspector, (920) 948-3500 , Friday, 7:45 A.M. - 4:30 P.M.
UW Oshkosh
Proposed Rules: The Wisconsin Division of Safety & Buildings is in the process of adopting the 2006 International
Code Council suite of building codes, including the International Existing Buildings Code, with a likely effective
date in the second half of 2007. You may view or download the proposed chs. Comm 61-65 hearing draft at
\vww.commerce. wi. gov/SB/SB-CodeDevelopment.html
New Rules: Effective April 1 , 2007, the Division of Safety & Buildings will be implementing new erosion control
and stormwater rules in ch. Comm 60 for projects begun on or after that date. You may view or download the rules
at www.commerce.wi.gov/SB/SB-CodeDevelopment.html Included in the rules will be expanded erosion control
coverage for.all commercial construction sites regardless of size. Required erosion control submittal information to
us may be done with a planned on-line webtool.