Loading...
HomeMy WebLinkAboutBuilding - 1375762 ; -. - ~j commerce.wi.gov \,;;,/ i~.E.qJlc!!n Safety and Buildings PO BOX 7162 MADISON WI 53707-7162 TDD#: (608) 264-8777 www.commerce.wi;gov/sb/ www.wisconsin.gov Jim Doyle, Governor Mary P. Burke, Secretary March 20, 2007 CUST ID No. 900786 AITN: Buildings & Structures Building Inspector MATTHEW LA WINGER 190 PAOLI ST PO BOX 930220 VERONA WI 53593 ..BUILDING INSPECTION CITY OF OSHKOSH POB 1130 OSHKOSH. WI 54902 (Pleasefonvard a copy of this letter to the fire department conducting inspections of this project.) CONDITIONAL APPROVAL - PLAN APPROVAL EXPIRES: 03/20/2008 SITE: Soper Plumbing Main & 16TH City of Oshkosh, FOR: Tenant Name or Addn/Alt Description: CHANGE FROM UNHEATED STORAGE TO HEATED, OCCUPIED STORAGE BUILDING Object Type: Building ICC Regulated Object ID No.: 1121208 Major Occupancy: Storage; Type VB Combustible Unprotected class of construction; Alteration plan; 4,680 project sq ft; Unsprinklered; Occupancy: B Business, S-1 Storage Moderate-Hazard; Allowable area determined by: Unseparated Use - \0 w\~ ~v€, 54902 The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements. The following conditions shall be met during construction or installation and prior to occupancy or use: Submit · Comm 61.30(3) This review does not include heating, ventila.ting or air conditioning. The owner should be reminded that HV AC plans, calculations, and appropriate fees are required to be submitted for review and approval prior to installation. The submitted HV AC plans shall match the approved building plans. Note as per Comm 2.10 installation of HV AC without approved plans could result in double fees. Reminders · This alteration is understood to create a heated storage building with offices from a previously unheated storage building (reviewed by Larry Stilen of our Waukesha office - Trans 945299, and later revised Building plans Trans 939875 & 931784). . . · Comm 6131(2)(b) A copy of this approval letter and index sheet shall be attached to plans that correspond with the copy on file with the Department. Changes to the approved plan must be submitted for review and approval. Failure to properly attach the approval and index page to plans that match the copye e' "- e9r: may result in enforcement action under ss. 101.02 or 443.13, Statutes. Note ~ as th d pI t _ -D sealed but not signed, I had to retain one of the signed and sealed Index sheetsfor 0 ie t remaining 3 index sheets have been returned to the submitter. MAR 2"1 2M { DEPARTMENT OF COMMUNITY DEVELOPMENT .t MATr'HEW LAWlNGER Page 2 3/20/2007 · Comm 61.36(1)(c) This approval will expire 1 year after the date of this letter if the work covered by this approval is not completed and the building ready for occupancy within that year. A copy of the approved plans, specifications and this letter shall be on-site during construction and open to inspection by authorized representatives of the Department, which may include local inspectors. If plan index sheets were submitted in lieu of additional full plansets, a copy of this approval letter and index sheet shall be attached to plans that correspond with the copy on file with the Department. All permits required by the state or the local municipality shall be obtained prior to commencement of construction/installation/operation. If this construction project will disturb one or more acres of land, an Erosion Control Notice of Intent (NOl) shall be filed with the department 14 days prior to any earth disturbing activities. In granting this approval the Division of Safety & Buildings reserves the right to require changes or additions should conditions arise making them necessary for code compliance. Asper state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. Inquiries concerning this correspondence may be made to me atthe telephone number listed below, or at the address on this letterhead. Fee Required $ Fee Received $ Balance Due $ 390.00 390.00 0.00 Dale 1 C ell Plan Examiner, ntegrated Services (608)266-0669, Mon - Fri, 7: 30AM To 4:00 pm dale.mitchell@wisconsin.gov cc: Peter R Ochs, State Building Inspector, (920) 948-3500 , Friday, 7:45 A.M. - 4:30 P.M. Diarie Soper, Soper Plumbing Inc Proposed Rules: The Wisconsin Division of Safety & Buildings i.s in the process of adopting the 2006 International Code Council suite of building codes, including the International Existing Buildings Code, with a likely effective date in the second half of 2007 . You may view or download the proposed chs. Comm 61-65 hearing draft at www.commerce.wi.gov/SB/SB-CodeDevelo{lment.html New Rules: Effective April 1, 2007, the Division of Safety & Buildings will be implementing new erosion control and stormwater rules in ch. Comm 60 for projects begun on or after that date. You may view or download the rules at www.commerce.wi.gov/SB/SB-CodeDevelo{lment.html Included in the rules will be expanded erosion control coverage for all commercial construction sites regardless of size. Required erosion control submittal information to us may be done with a planned on-line webtool.