HomeMy WebLinkAboutBuilding - 1375762
;
-. -
~j commerce.wi.gov
\,;;,/ i~.E.qJlc!!n
Safety and Buildings
PO BOX 7162
MADISON WI 53707-7162
TDD#: (608) 264-8777
www.commerce.wi;gov/sb/
www.wisconsin.gov
Jim Doyle, Governor
Mary P. Burke, Secretary
March 20, 2007
CUST ID No. 900786
AITN: Buildings & Structures Building Inspector
MATTHEW LA WINGER
190 PAOLI ST
PO BOX 930220
VERONA WI 53593
..BUILDING INSPECTION
CITY OF OSHKOSH
POB 1130
OSHKOSH. WI 54902
(Pleasefonvard a copy of this letter to the fire
department conducting inspections of this project.)
CONDITIONAL APPROVAL
- PLAN APPROVAL EXPIRES: 03/20/2008
SITE:
Soper Plumbing
Main & 16TH
City of Oshkosh,
FOR:
Tenant Name or Addn/Alt Description: CHANGE FROM UNHEATED STORAGE TO HEATED, OCCUPIED
STORAGE BUILDING
Object Type: Building ICC Regulated Object ID No.: 1121208
Major Occupancy: Storage; Type VB Combustible Unprotected class of construction; Alteration plan; 4,680 project sq
ft; Unsprinklered; Occupancy: B Business, S-1 Storage Moderate-Hazard; Allowable area determined by: Unseparated
Use -
\0 w\~ ~v€,
54902
The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes
and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in
chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements.
The following conditions shall be met during construction or installation and prior to occupancy or use:
Submit
· Comm 61.30(3) This review does not include heating, ventila.ting or air conditioning. The owner should be
reminded that HV AC plans, calculations, and appropriate fees are required to be submitted for review and
approval prior to installation. The submitted HV AC plans shall match the approved building plans. Note as
per Comm 2.10 installation of HV AC without approved plans could result in double fees.
Reminders
· This alteration is understood to create a heated storage building with offices from a previously unheated storage
building (reviewed by Larry Stilen of our Waukesha office - Trans 945299, and later revised Building plans
Trans 939875 & 931784). . .
· Comm 6131(2)(b) A copy of this approval letter and index sheet shall be attached to plans that correspond with
the copy on file with the Department. Changes to the approved plan must be submitted for review and approval.
Failure to properly attach the approval and index page to plans that match the copye e' "- e9r:
may result in enforcement action under ss. 101.02 or 443.13, Statutes. Note ~ as th d pI t _ -D
sealed but not signed, I had to retain one of the signed and sealed Index sheetsfor 0 ie t
remaining 3 index sheets have been returned to the submitter.
MAR 2"1 2M {
DEPARTMENT OF
COMMUNITY DEVELOPMENT
.t
MATr'HEW LAWlNGER
Page 2
3/20/2007
· Comm 61.36(1)(c) This approval will expire 1 year after the date of this letter if the work covered by this
approval is not completed and the building ready for occupancy within that year.
A copy of the approved plans, specifications and this letter shall be on-site during construction and open to
inspection by authorized representatives of the Department, which may include local inspectors. If plan index sheets
were submitted in lieu of additional full plansets, a copy of this approval letter and index sheet shall be attached to
plans that correspond with the copy on file with the Department. All permits required by the state or the local
municipality shall be obtained prior to commencement of construction/installation/operation. If this construction
project will disturb one or more acres of land, an Erosion Control Notice of Intent (NOl) shall be filed with the
department 14 days prior to any earth disturbing activities.
In granting this approval the Division of Safety & Buildings reserves the right to require changes or additions should
conditions arise making them necessary for code compliance. Asper state stats 101.12(2), nothing in this review
shall relieve the designer of the responsibility for designing a safe building, structure, or component.
Inquiries concerning this correspondence may be made to me atthe telephone number listed below, or at the address
on this letterhead.
Fee Required $
Fee Received $
Balance Due $
390.00
390.00
0.00
Dale 1 C ell
Plan Examiner, ntegrated Services
(608)266-0669, Mon - Fri, 7: 30AM To 4:00 pm
dale.mitchell@wisconsin.gov
cc: Peter R Ochs, State Building Inspector, (920) 948-3500 , Friday, 7:45 A.M. - 4:30 P.M.
Diarie Soper, Soper Plumbing Inc
Proposed Rules: The Wisconsin Division of Safety & Buildings i.s in the process of adopting the 2006 International
Code Council suite of building codes, including the International Existing Buildings Code, with a likely effective
date in the second half of 2007 . You may view or download the proposed chs. Comm 61-65 hearing draft at
www.commerce.wi.gov/SB/SB-CodeDevelo{lment.html
New Rules: Effective April 1, 2007, the Division of Safety & Buildings will be implementing new erosion control
and stormwater rules in ch. Comm 60 for projects begun on or after that date. You may view or download the rules
at www.commerce.wi.gov/SB/SB-CodeDevelo{lment.html Included in the rules will be expanded erosion control
coverage for all commercial construction sites regardless of size. Required erosion control submittal information to
us may be done with a planned on-line webtool.