Loading...
HomeMy WebLinkAbout0123861-Plumbing (laterals) e CITY OF OSHKOSH No OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1030 JOHN MOORE DR Owner RUSCH HOMES LLC Create Date 123861 03/21/2007 Category 401 - Residential-Exterior (laterals) Plan Contractor J & P EXCAVATING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Steri I izer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs NSFR/ Laterals **debit acct I Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New Storm Sewer 4" Plastic Lateral 1 New Water Service 1-1/4" Plastic Lateral 1 New Parcelld # $1,100.00 $0.00 $150.00 D Permit Voided I Plan Approval Permit Fees Date 03/21/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner OSHKOSH WI 54904 - 0000 Telephone Number 379-0309 (C) Address 3162 SCENIC DR To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.