Loading...
HomeMy WebLinkAbout0123855-Building o OSHKOSH ON THE WATER Job Address 880 FREEDOM AVE CITY OF OSHKOSH No 123855 BUILDING PERMIT - APPLICATION AND RECORD Owner JEREMY J/JODIE L DYKEN Create Date 03/20/2007 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRI LATE PERMIT/ Finishing a portion of the basement* to include a Rec room, office, closet and a full bathroom. Work was of Work completed without inspections. HVAC Contractor Plumbing Contractor HOMEOWNER Electric Contractor HOMEOWNER $9,300.00 Plan Approval '1 $0.00 Permit Fee Paid $88.00 Park Dedication Fees: Valuation $0.00 Issued By: Date 03/20/2007 Final/D.P. 00/00/0000 o Permit Voided I Parcel Id # 1250176500 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ssa als before starting such agtivity. Date ~ 31cJo/07 Signature Address OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. '" ~ t:~~'\" /c:~?..:-,. SC'..... 1 '9 1l j '" ..' r':;.;..:. I <p 0 ;\-\If? oQ of} t1, ,,"\1 ~ - 6':"..>1.* ' ,t/-€ ~p: r- 14'-8" j -- ./ ... tV~ \l~ '4,~ ~O 5E ~'- { ~I -A ~ I ~LI ,14,..... .'..0- ~ aO "" 9.. e,C I 90'..,c~(1 (tAli , D~ +h 6k 2' GARAGE 21'.0" "TUt: A:::>/:.. ~I elf 10'-4' ~ "