Loading...
HomeMy WebLinkAbout0123850-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 1100 E MURDOCK AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 123850 Owner ST ANDREW EVAN LUTH CHURCH Contractor D.R. HANSEN PLBG. Bathtub Whirlpool Lavatory Toilet ">""-^"~'..''':~'''~1'''''~ Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal ''''''', "', ,"..,->-,...,.,...,,-',.....~.- Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Create Date 03/19/2007 Category 441 -Industrial-Water Heaters Plan Wait. St. Ice Chest Exam Sink Sculry Sink H'"-'''-.H:;~'~f'si;;k--'. . ~,~~.w "."..,."..." Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Uri;;af" Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve EyeWashSi'atn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs ,~ Install water heater and receptor for T&P relief in additon to work started on permit #122116 "'Debit Account Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1514817400 Valuation Issued By $250.00 Plan Approval $0.00 Permit Fees $25.00 D Permit Voided I Date 03/19/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address 55 KNAPP ST OSHKOSH WI 54902 - 3448 Telephone Number 233-1595 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.