Loading...
HomeMy WebLinkAbout0123831-Building G OSHKOSH ON THE WATER Job Address 400-430 N KOELLER ST CITY OF OSHKOSH No 123831 BUILDING PERMIT - APPLICATION AND RECORD Owner DUMKE & ASSOCIATES LLC Create Date 03/16/2007 Designer Contractor ACCURATE ROOFING Category 140 - Interior Remodeling Plan type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: VB Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature 1430 N Koeller - Interior Demolition of non-bearing walls as per plans to prepare space for new tenant space alterations - additional plans of Work required for additional work. HV AC Contractor Plumbing Contractor Electric Contractor ,000.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Issued By" . Date 03/16/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1611220000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and.~. s~ any neces ry apP!~~~ before starting such activity. /, / Signature {., .....-~ Date .14 " L 0 7 Agent/Owner ,. I Address 1011 KANSAS ST OSHKOSH WI 54902 - 0000 Telephone Number 303-1897 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.