HomeMy WebLinkAboutPlumbing D1-9-0202-P
~
OJHKOJH
City of Oshkosh
Inspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
(920) 236-5049 (920) 236-5106
FAX
ON THE WATER
February 20, 2002
Soper Plumbing
2225 Burnwood Or.
Oshkosh, WI 54902
Oshkosh HO,spitality LLC
Ref: Plumbing Plan Approval: 500 S. Koeller St., Oshkosh, WI
Plan 10# 01 ~9-0202-P
Oear Sirs,
Examination of the plumbing plans and specifications for this project has been completed.
In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin
Administrative Code, the plumbing plans and specifications are approved contingent upon
compliance with the stipulation(s) noted below.
1. NONE
In the event installation of this plumbing system has not commenced within two years
from this date, this approval shall become void. A new application accompanied by full
examination fees shall be filed and an updated approval received before work may
commence.
In granting this approval, the City of Oshkos~ or its representative does not hold itself
liable for any defects in plans or specifications, plan omissions, examination oversight,
construction or any damage that may result in or after installation. The City of Oshkosh
reserves the right to order changes or additiops should conditions arise making this
necessary.
It shall be necessary for the installing plumber to obtain a plumbing permit from the City
of Oshkosh before proceeding with actual installation of this plumbing system or any of
its parts.
Respectfully,
Richard Wood,
Plumbing Inspector