Loading...
HomeMy WebLinkAbout2006-Building o OSHKOSH ON THE WATER Job Address 1003 WRIGHT ST CITY OF OSHKOSH No 122197 BUILDING PERMIT - APPLICATION AND RECORD Owner K & K PROPERTIES Create Date 10/10/2006 Designer Contractor OWNER Category 161 - Wrecking Residential Dwellings Plan Type o Building o Sign o Canopy o Fence . Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Sq. Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures Use/Nature iSFRI Razing the dwelling* for new construction. The existing garage and slab will be used for the new dwelling. of Work HV AC Contractor Plumbing Contractor Electric Contractor $4,500.00 Plan Approval t2--1- ~ Aa D Permit Voided I $0.00 Permit Fee Paid $53.00 Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 10/20/2006 Final/O.P. 00/00/0000 Parcelld ~I 0501550000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature r Date '7 Address 2347 ASHLAND ST AgenUOwner Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.