Loading...
HomeMy WebLinkAbout2004-Plumbing (laterals) e OSHKOSH ON THE WATER CITY OF OSHKOSH ~ No ~'f;O ~ \ PLUMBING PERMIT - APPLICATION AND RECO{fD ~ u.j \0 " k'" \tP ~ Q~t '-...J::reate Date Job Address 280 282 WYLDEWOOD DR 107207 Owner MIDWEST GENERAL CONTRACTORS 04/02/2004 Contractor RADTKE CONTRACTORS INC Category 401 - Residential-Exterior (laterals) Plan Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 - - Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 - - - - Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 - - - - - - Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 - Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 - - - - - Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 - - - - Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work NEW TWINDOMINIUM Size Type Material Sanitary Sewer TWN OF ALGO Storm Sewer SURFACE Water Service 1.5 Plastic Lateral # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 1 New 0 Parcelld # 0 $50.00 D Permit Voided I Valuation $2,500.00 Plan Approval $0.00 Permit Fees Issued By Date 04/02/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) nd to secure any necessa approvals before starting such activity. Signature ./ Address 6408 STATE RD 110 Agent/Owner WINNECONNE WI 54986 - 0000 Telephone Number (920) 582-4114 Date ~~~.r-/ To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.