Loading...
HomeMy WebLinkAbout2004-HVAC o OSHKOSH ON THE WATER Job Address 240 242 WYLDEWOOD DR CITY OF OSHKOSH ;t:~~'\ No IS 2! W ~~ - r- HVAC PERMIT -APPLICATION AND RECORD~ ~ ~'<<:, 112034 Owner MIDWEST GENERAL CONTRACTORS Create Date 03/23/2004 Contractor BREWER HEATING Fuel I I Gas UOil System D New U Forced Air U Radiant U Electric I I Hot Water Chimney Type K:) Chimney A () Chimney B Heat Loss K:) As Approved () Existing BTU Rate K:J As Per Plan () Variable Category 502 - Residential-Both U Electric D Replace U Steam U Suppl. () Direct Vent Plan U Solar [I Solid [J Other U AlC [J Vent I I Con. Burner . Not Applicable . Not Applicable . Other Value o Value Use/Nature DUPLEXl1 story two unit condo with 2 car attached garage. Master Plan-each condo has a sunroom with a rear covered deck. NOTE: of Work valled Brewer 12/13/04 to state that the permit was doubled due to it being late. Final inspections are requested and the permit has not Jeen obtained. Fees: Valuation $8,600.00 Plan Approval $0.00 Permit Fee Paid $268.00 Date 12/16/2004 Issued By: D Permit Voided I Parcelld # In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address N8804 N DOUGLAS ST RIPON WI 54971 - 0 Telephone Number 920-748-6494 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.