HomeMy WebLinkAbout0123773-Plumbing (pedicure chair)
e
OSHKOSH
ON THE WATER
Job Address 2010-2100 W 9TH AVE
Contractor MOREMAN PLBG & HTG SERVICE INC
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No 123773
Bathtub Shower Water Softner
Whirlpool Floor Drain Local Waste
Lavatory Lndry Tray Clothes Wshr
Toilet Disposal Bidet
Res. Sink Dishwasher Beer Tap
Bar Sink Sump Pump Lab Sink
Water Heater Classrm Sink Sterilizer
Site Drain Breakrm Sink Dip Well
Roof Drain Ejector/Grind Drink Ftn
Misc. 2 Pedicure chairs
Fixtures
Owner TOWER ASSOCIATES LLC
Category 440 - Industrial-Interior
Wait. St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink
Flr/Wst Sink
Catch Basin
Wash Ftn
o Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Create Date 03/09/2007
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Space 2028/ Install pedicure chairs for new nail salon, "#1 Nials."
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0614660000
Use/Nature
of Work
$25.00 0 Permit Voided I
Valuation
$1,200.00 Plan Approval
$0.00 Permit Fees
Issued By
Date 03/12/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity..
Signature
Address PO BOX 1325
Agent/Owner
OSHKOSH
WI 54903 - 0000 Telephone Number 231-9191
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.