Loading...
HomeMy WebLinkAbout0123773-Plumbing (pedicure chair) e OSHKOSH ON THE WATER Job Address 2010-2100 W 9TH AVE Contractor MOREMAN PLBG & HTG SERVICE INC CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 123773 Bathtub Shower Water Softner Whirlpool Floor Drain Local Waste Lavatory Lndry Tray Clothes Wshr Toilet Disposal Bidet Res. Sink Dishwasher Beer Tap Bar Sink Sump Pump Lab Sink Water Heater Classrm Sink Sterilizer Site Drain Breakrm Sink Dip Well Roof Drain Ejector/Grind Drink Ftn Misc. 2 Pedicure chairs Fixtures Owner TOWER ASSOCIATES LLC Category 440 - Industrial-Interior Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink Flr/Wst Sink Catch Basin Wash Ftn o Urinal Standp Rec Ice Maker Gar Drain Soda Disp Create Date 03/09/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Space 2028/ Install pedicure chairs for new nail salon, "#1 Nials." Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0614660000 Use/Nature of Work $25.00 0 Permit Voided I Valuation $1,200.00 Plan Approval $0.00 Permit Fees Issued By Date 03/12/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity.. Signature Address PO BOX 1325 Agent/Owner OSHKOSH WI 54903 - 0000 Telephone Number 231-9191 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.