Loading...
HomeMy WebLinkAbout0123743-Plumbing (water heater) G CITY OF OSHKOSH 123743 OSHKOSH PLUMBING PERMIT.. APPLICATION AND RECORD ON THE WATER Job Address 2010-2100 W 9TH AVE Owner TOWER ASSOCIATES LLC Create Date 03/08/2007 Contractor MOREMAN PLBG & HTG SERVICE INC Category 441 - Industrial-Water Heaters Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrfWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature 'Install 52 gallon electric water heater at "#1 Nails" tenant space 2028 w 9th ave. EIV unknown. <<<debit acct of Work Valuation Issued By Size , ' Material Type Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Parcel Id # 0614660000 Date 03/08/2007 # Conn. Type Sanitary Sewer Storm Sewer Water Service $500.00 Plan Approval $0.00 Permit Fees $25.00 D Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address PO BOX 1325 OSHKOSH WI 54903 - 0000 Telephone Number 231-9191 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.