HomeMy WebLinkAbout0123743-Plumbing (water heater)
G CITY OF OSHKOSH 123743
OSHKOSH PLUMBING PERMIT.. APPLICATION AND RECORD
ON THE WATER
Job Address 2010-2100 W 9TH AVE Owner TOWER ASSOCIATES LLC Create Date 03/08/2007
Contractor MOREMAN PLBG & HTG SERVICE INC
Category 441 - Industrial-Water Heaters
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest FlrfWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature 'Install 52 gallon electric water heater at "#1 Nails" tenant space 2028 w 9th ave. EIV unknown. <<<debit acct
of Work
Valuation
Issued By
Size
, '
Material
Type
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Parcel Id #
0614660000
Date 03/08/2007
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
$500.00 Plan Approval
$0.00 Permit Fees
$25.00 D Permit Voided I
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
AgenUOwner
Address PO BOX 1325
OSHKOSH
WI 54903 - 0000 Telephone Number 231-9191
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.