Loading...
HomeMy WebLinkAbout0123720-Building (foundation) e OSHKOSH ON THE WATER Job Address 729 SIEWERT TRL CITY OF OSHKOSH No 123720 BUILDING PERMIT - APPLICATION AND RECORD Owner CITY OF OSHKOSH (PARKS) Create Date 03/06/2007 Designer Contractor VIENOLA BROS. Category 261 - City of Oshkosh-Addition Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Maintenance Building - Foundation for addition. * Walls not to be poured without clarification from Designer regarding anchor bolt of Work placement. ( HV AC Contractor Plumbing Contractor Fees: Valua $7,000.00 Plan Approval $0.00 Permit Fee Paid $0.00 Park Dedication $0.00 Issued By: Date 03/06/2007 Final/O.P. DO/DO/DODO D Permit Voided I Parcelld # In'the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 1130 OSHKOSH WI 54903 - 1130 Telephone Number MAINTENANCE GAF To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.