HomeMy WebLinkAbout0123720-Building (foundation)
e
OSHKOSH
ON THE WATER
Job Address 729 SIEWERT TRL
CITY OF OSHKOSH No 123720
BUILDING PERMIT - APPLICATION AND RECORD
Owner CITY OF OSHKOSH (PARKS) Create Date 03/06/2007
Designer
Contractor VIENOLA BROS.
Category
261 - City of Oshkosh-Addition Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Sq. Ft.
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature Maintenance Building - Foundation for addition. * Walls not to be poured without clarification from Designer regarding anchor bolt
of Work placement. (
HV AC Contractor
Plumbing Contractor
Fees: Valua
$7,000.00 Plan Approval
$0.00 Permit Fee Paid
$0.00 Park Dedication
$0.00
Issued By:
Date 03/06/2007
Final/O.P. DO/DO/DODO
D Permit Voided I
Parcelld #
In'the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 1130
OSHKOSH
WI 54903 - 1130 Telephone Number MAINTENANCE GAF
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.