Loading...
HomeMy WebLinkAbout0123700-Building (remodel) e OSHKOSH ON THE WATER Job Address 140-150 N KOELLER ST CITY OF OSHKOSH No 123700 - BUILDING PERMIT - APPLICATION AND RECORD Designer Derek Maul Owner 150 N KOELLER ST LLC Create Date 03/02/2007 Contractor LEE-ALLEN CONSTRUCTION LLC Category 223 - Alteration Offices, Banks, Professional Plan X4-1922-0207 Type . Building o Sign o Canopy o Fence o Raze .___J Zoning Class of Const: VB Size Finished/Living Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Unfinished/Basement Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Required Flood Plain No Height Permit. ,Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature 140 N Koeller / Interior Alterartions as per plans for Enterprise Rent-A Car. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Val w~ Plan Approval $0.00 Permit Fee Paid $304.0-0- Park Dedication $0.00 Issued By: Date 03/06/2007 Final/O.P. 00/0010000 D Permit Voided I Parcelld # 0611520300 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit applicaf within an easeme the City strongly urges the permit applicant to contact the easement holder(s) and to secure any n es~a~ ~pprova e starting such activity. Signature b' Date 3-6- t)'-/ Agent/Owner Address 936 FREDONIA AVE FREDONIA WI 53021 - 0000 Telephone Number 262-692-3549 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.