HomeMy WebLinkAbout0123700-Building (remodel)
e
OSHKOSH
ON THE WATER
Job Address 140-150 N KOELLER ST
CITY OF OSHKOSH No 123700 -
BUILDING PERMIT - APPLICATION AND RECORD
Designer
Derek Maul
Owner 150 N KOELLER ST LLC Create Date 03/02/2007
Contractor LEE-ALLEN CONSTRUCTION LLC
Category
223 - Alteration Offices, Banks, Professional
Plan X4-1922-0207
Type
. Building
o Sign
o Canopy
o Fence
o Raze
.___J
Zoning
Class of Const: VB
Size
Finished/Living
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height Ft.
D Projection I
Unfinished/Basement
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Required
Flood Plain No
Height Permit. ,Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature 140 N Koeller / Interior Alterartions as per plans for Enterprise Rent-A Car.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Val
w~ Plan Approval
$0.00 Permit Fee Paid
$304.0-0- Park Dedication
$0.00
Issued By:
Date 03/06/2007
Final/O.P. 00/0010000
D Permit Voided I
Parcelld # 0611520300
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit applicaf within an easeme the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any n es~a~ ~pprova e starting such activity.
Signature b' Date 3-6- t)'-/
Agent/Owner
Address
936 FREDONIA AVE
FREDONIA
WI 53021 - 0000
Telephone Number
262-692-3549
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.