HomeMy WebLinkAbout0123682-Plumbing (drink ftn))
G
OSHKOSH
ON THE WATER
Job Address 3815 OREGON ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No 123682
Owner POW'R GARD GENERATOR CORP
Create Date 02/22/2007
Contractor HURCKMAN MECHANICAL INDUSTRIES, INC. Category 440 - Industrial-Interior
Plan V-211-0806-P
Bathtub Shower Water Softner
Whirlpool Floor Drain Local Waste
Lavatory Lndry Tray Clothes Wshr
Toilet Disposal Bidet
Res. Sink Dishwasher Beer Tap
Bar Sink Sump Pump Lab Sink
Water Heater Classrm Sink Sterilizer
Site Drain Breakrm Sink Dip Well
Roof Drain Ejector/Grind Drink Ftn
Misc.
Fixtures
Use/Nature Work added with permit #121235.
of Work
Wait. St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
.Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Material
Sanitary Sewer
Storm Sewer
Water Service
Type
#
Conn. Type
Parcelld #
1413680802
Valuation
$262,000.00 Plan Approval
$0.00 Permit Fees
Issued By
$14.00 0 Permit Voided I
Date 03/05/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address POBOX 10977
GREEN BAY
WI 54307 - 0977 Telephone Number 920-499-6984 EXT 1
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.