HomeMy WebLinkAbout0123654-Building
o
OSHKOSH
ON THE WATER
Job Address 2855 S OAKWOOD ST
CITY OF OSHKOSH No 123654
BUILDING PERMIT - APPLICATION AND RECORD
Owner BRUNSWICK CORP Create Date 02/22/2007
Designer
Contractor CONSOLIDATED CONST
Category
290 - Miscellaneous (Structures other than buildings) Plan V4-91-0906
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq. Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature IND/ Construction of 18' x 36' covered dumpster enclosure as per plans. - No plan review required or conducted.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Plan Approval
$0.00 Permit Fee Paid
$88.00 Park Dedication
$0.00
Issued By:
Date 03/02/2007
FinaIlO.P. 00/00/0000
o Permit Voided I
Parcel Id # 1329110000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
h~lde~') "" ~,,~,"' ~"""""l\"P~befo'" ,tarn09 ,"oh ,_.
Signature ~ (JQ~ Date ~ ~~ - D'1
Agent/Owner
Address 4300 N. RICHMOND
APPLETON
WI 54915 - 0000 Telephone Number 739-3555
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.