HomeMy WebLinkAbout2006-Building
.e.
OSHKOSH
ON THE WATER
Job Address 130 WYLDEWOOD DR
CITY OF OSHKOSH No 121199
BUILDING PERMIT - APPLICATION AND RECORD
Owner MIDWEST GENERAL CONTRACTORS Create Date 08/22/2006
Designer
Contractor
MIDWEST GENERAL CONTRACTORS INC
Category
212 - New Parking Garages (building & open decked)
Plan U8-85-0806
-
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature COMM/ 38 Stall garage unit.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$114,000.00 Plan Approval
$0.00 Permit Fee Paid
$445.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 08/22/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcel Id #
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an sem nt e City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary ap al starting such activity.
Date
r :..:>yV()
Signature
Address 2990 UNIVERSAL ST STE C
WI 54904 - 5903 Telephone Number 426-2008
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
e~.(
OSHKOSH
ON THE WATER
Name MIDWEST GENERAL CONTRACTORS
Lot 38 STALL GARAGE UNIT
Subdivision WYLDEWOOD VILLAGE
Street Number
GRADE STAKE FORM
Address 130 WYLDEWOOD DR
Grade Stake Number 7388
Create Date 08/22/2006
Block
Zone
Lot Dimensions
Ward
U Sidewalk Existing =:J
Building Grade Elevation Stakes Set At Site 08/22/2006 Set By
Department of Public Works
I, the undersigned, owner or agent of the above described property agree to have the
has commenced.
Building Permit Work Card
Job Address 130 WYLDEWOOD DR Permit Number 0121199
Create Date 8/22/2006
Owner MIDWEST GENERAL CONTRACTORS
Contractor MIDWEST GENERAL CONTRACTORS INC
Category 212 - New Parking Garages (building & open decked)
Plan U8-85-0806
Occupany Permit Not Required Flood Plain
Use/Nature ICOMMI 38 Stall g'"". "";t
of Wort<
HVAC Contr
Height Permit
Class of Const:
Plumbing Contr
Electric Contr
Inspections:
Date 7/23/2007 Type Rough In Inspector Nicole Krahn
1) The roof trusses are required to be properly connected to the posts for the open area of the garage at the west end.
not approved
DatelTime requested: 7/24/2007
Access: I
Request~d By: ~.
o Reinspect Fee 0 Fee Waived
08:01 AM
Notice Type:
Ready DatelTime: 7/24/2007 08:01 AM
Phone Number:
D Reinspect Fee Paid
Date 9/19/2007 Type Final Inspector Nicole Krahn not approved
REQUEST LINE / READY FOR A FINAL INSPECTION 1) Fire seperation is required along the rear walls due to the gaps from the
hurricane ties.
DatelTime requested: 9/19/2007 09:53 AM Notice Type:
Access: I
Requested By: MIDWEST GENERAL CONTRACTORS INC - Jay
o Reinspect Fee 0 Fee Waived D Reinspect Fee Paid
Ready DatelTime: 9/19/2007 09:53 AM
Phone Number: (920) 420-5878
Date 10/22/2007 Type Re Final Inspector Nicole Krahn
NOTE: I did a random inspection of several garage units and the violations were corrected.
approved w/cond.
DatelTime requested: 10/22/2007 01:40 PM Notice Type:
Access: I
Requested By:
o Reinspect Fee 0 Fee Waived D Reinspect Fee Paid
Ready DatelTime: 10/22/200701:40 PM
Phone Number:
Page 1 of 1
Buildings, HV AC Compliance Statement SBO-9720
This form is required to be submitted by the supervising professional (architect, engineer, HVAC designer or electrical
designer) observing construction of projects within buildings with total areas exceeding 50,000 cubic feet or greater and
bleachers (Comm 50.1 O/Comm 61.50). Failure to submit this form may result in penalties as specified in Comm
50.Z6/Comm 61.23 and/or local ordinances.
Generallnslructions: Prior to the initial occupancy of new buildings or additions and the final occupancy of
altered existing buildings, submit this completed and signed form to:
· The municipal building inspection office and
· Safety and Buildings, 10541 N Ranch Road, Hayward, WI 54843
Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04 (1)(m)).
1. PROJECT INFORMATION: Please fill in the following with information from your plan approval letter.
Transaction ID Number
Site Number 711513
Site location (number & street)
o City 0 Village 0
1284386
~QOP.38$'tAr:tl;;;6;~(;F;.
................. ..'...._;;~
Town Of OSHKOSH
County of
WINNEBAGO
2. PURPOSE OF THIS STATEMENT: (Check Box A, B, C, or D to indicate purpose and complete any other
applicable boxes and information. Attach additional pages if necessary).
Check those which apply: 0 Builqing Object 10# 1082021 0 HVAC Object ID#
o Lighting Object ID#
D Partial Completion
Description of Portion Completed
A) 0 Statement of Substantial Compliance
To the best of my knowledge, belief, and based on onsite observation, construction of the following building and/or HVAC
items applicable to this project have been completed in substantial compliance with the approved plans and specifications.
o BUILDINGILIGHTING ITEMS
1. Structural system including submittal and erection of all building
components (trusses, precast, metal building, etc.)
2. Fire protection systems (sprinklers, alarms, smoke detectors)
designed, installed, and tested (including forward flow on back flow
devices) by appropriately registered professionals.
3. Shaft and stairway enclosure
4. Exits including exit and directional lights
5. Fire-resistive construction, enclosure of hazards, fire walls, labeled
doors, class of construction, fire stopped penetrations
6. Sanitation system (toilets, sinks, drinking facilities)
7. Barrier-free including Comm 18 elevators and lifts
8. Energy envelope requirements
9. All conditions of building plan approval and applicable variances
The following items are not in compliance and must be addressed:
10. Exterior lighting & control requirements
11. Interior lighting & control requirements
12. All conditions of lighting plan approval
and applicable variances
o HVAC ITEMS
1. HVAC system in~luding final test
2. All conditions of HVAC plan approval
and applicable variances
B) 0 Statement of Noncompliance
Due to the following listed violations, this project is not ready for occupancy:
C) 0 Supervising Professional Withdrawn From Project (Use A or B above to indicate pro~ect status as of this date.)
D) D Project Abandoned
3. SUPERVISING PROFESSIONAL SIGNATURE FOR:
o Building 0 HVAC 0 Lighting DON HAANEN 10/8/2007
Name (please print or type)
Phone # 920-497-!;i007 Customer 10# 649536 Signature
SBD-9720 (R.01l2003)