Loading...
HomeMy WebLinkAbout2006-Building .e. OSHKOSH ON THE WATER Job Address 130 WYLDEWOOD DR CITY OF OSHKOSH No 121199 BUILDING PERMIT - APPLICATION AND RECORD Owner MIDWEST GENERAL CONTRACTORS Create Date 08/22/2006 Designer Contractor MIDWEST GENERAL CONTRACTORS INC Category 212 - New Parking Garages (building & open decked) Plan U8-85-0806 - Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature COMM/ 38 Stall garage unit. of Work HVAC Contractor Plumbing Contractor Electric Contractor $114,000.00 Plan Approval $0.00 Permit Fee Paid $445.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 08/22/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an sem nt e City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary ap al starting such activity. Date r :..:>yV() Signature Address 2990 UNIVERSAL ST STE C WI 54904 - 5903 Telephone Number 426-2008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. e~.( OSHKOSH ON THE WATER Name MIDWEST GENERAL CONTRACTORS Lot 38 STALL GARAGE UNIT Subdivision WYLDEWOOD VILLAGE Street Number GRADE STAKE FORM Address 130 WYLDEWOOD DR Grade Stake Number 7388 Create Date 08/22/2006 Block Zone Lot Dimensions Ward U Sidewalk Existing =:J Building Grade Elevation Stakes Set At Site 08/22/2006 Set By Department of Public Works I, the undersigned, owner or agent of the above described property agree to have the has commenced. Building Permit Work Card Job Address 130 WYLDEWOOD DR Permit Number 0121199 Create Date 8/22/2006 Owner MIDWEST GENERAL CONTRACTORS Contractor MIDWEST GENERAL CONTRACTORS INC Category 212 - New Parking Garages (building & open decked) Plan U8-85-0806 Occupany Permit Not Required Flood Plain Use/Nature ICOMMI 38 Stall g'"". "";t of Wort< HVAC Contr Height Permit Class of Const: Plumbing Contr Electric Contr Inspections: Date 7/23/2007 Type Rough In Inspector Nicole Krahn 1) The roof trusses are required to be properly connected to the posts for the open area of the garage at the west end. not approved DatelTime requested: 7/24/2007 Access: I Request~d By: ~. o Reinspect Fee 0 Fee Waived 08:01 AM Notice Type: Ready DatelTime: 7/24/2007 08:01 AM Phone Number: D Reinspect Fee Paid Date 9/19/2007 Type Final Inspector Nicole Krahn not approved REQUEST LINE / READY FOR A FINAL INSPECTION 1) Fire seperation is required along the rear walls due to the gaps from the hurricane ties. DatelTime requested: 9/19/2007 09:53 AM Notice Type: Access: I Requested By: MIDWEST GENERAL CONTRACTORS INC - Jay o Reinspect Fee 0 Fee Waived D Reinspect Fee Paid Ready DatelTime: 9/19/2007 09:53 AM Phone Number: (920) 420-5878 Date 10/22/2007 Type Re Final Inspector Nicole Krahn NOTE: I did a random inspection of several garage units and the violations were corrected. approved w/cond. DatelTime requested: 10/22/2007 01:40 PM Notice Type: Access: I Requested By: o Reinspect Fee 0 Fee Waived D Reinspect Fee Paid Ready DatelTime: 10/22/200701:40 PM Phone Number: Page 1 of 1 Buildings, HV AC Compliance Statement SBO-9720 This form is required to be submitted by the supervising professional (architect, engineer, HVAC designer or electrical designer) observing construction of projects within buildings with total areas exceeding 50,000 cubic feet or greater and bleachers (Comm 50.1 O/Comm 61.50). Failure to submit this form may result in penalties as specified in Comm 50.Z6/Comm 61.23 and/or local ordinances. Generallnslructions: Prior to the initial occupancy of new buildings or additions and the final occupancy of altered existing buildings, submit this completed and signed form to: · The municipal building inspection office and · Safety and Buildings, 10541 N Ranch Road, Hayward, WI 54843 Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04 (1)(m)). 1. PROJECT INFORMATION: Please fill in the following with information from your plan approval letter. Transaction ID Number Site Number 711513 Site location (number & street) o City 0 Village 0 1284386 ~QOP.38$'tAr:tl;;;6;~(;F;. ................. ..'...._;;~ Town Of OSHKOSH County of WINNEBAGO 2. PURPOSE OF THIS STATEMENT: (Check Box A, B, C, or D to indicate purpose and complete any other applicable boxes and information. Attach additional pages if necessary). Check those which apply: 0 Builqing Object 10# 1082021 0 HVAC Object ID# o Lighting Object ID# D Partial Completion Description of Portion Completed A) 0 Statement of Substantial Compliance To the best of my knowledge, belief, and based on onsite observation, construction of the following building and/or HVAC items applicable to this project have been completed in substantial compliance with the approved plans and specifications. o BUILDINGILIGHTING ITEMS 1. Structural system including submittal and erection of all building components (trusses, precast, metal building, etc.) 2. Fire protection systems (sprinklers, alarms, smoke detectors) designed, installed, and tested (including forward flow on back flow devices) by appropriately registered professionals. 3. Shaft and stairway enclosure 4. Exits including exit and directional lights 5. Fire-resistive construction, enclosure of hazards, fire walls, labeled doors, class of construction, fire stopped penetrations 6. Sanitation system (toilets, sinks, drinking facilities) 7. Barrier-free including Comm 18 elevators and lifts 8. Energy envelope requirements 9. All conditions of building plan approval and applicable variances The following items are not in compliance and must be addressed: 10. Exterior lighting & control requirements 11. Interior lighting & control requirements 12. All conditions of lighting plan approval and applicable variances o HVAC ITEMS 1. HVAC system in~luding final test 2. All conditions of HVAC plan approval and applicable variances B) 0 Statement of Noncompliance Due to the following listed violations, this project is not ready for occupancy: C) 0 Supervising Professional Withdrawn From Project (Use A or B above to indicate pro~ect status as of this date.) D) D Project Abandoned 3. SUPERVISING PROFESSIONAL SIGNATURE FOR: o Building 0 HVAC 0 Lighting DON HAANEN 10/8/2007 Name (please print or type) Phone # 920-497-!;i007 Customer 10# 649536 Signature SBD-9720 (R.01l2003)