HomeMy WebLinkAbout2006-Plumbing (laterals)
G CITY OF OSHKOSH No 121695
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 110 WYLDEWOOD DR Owner MIDWEST GENERAL CONTRACTORS Create Date 09/25/2006
Contractor 4 WAY CONSTRUCTION
Category 430 - Industrial-Exterior (laterals)
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature ~" water lateral for new 16-unit
of Work
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Conn. Type
Material
Type
#
Sanitary Sewer
Storm Sewer
Water Service
2"
Plastic
Lateral
New
Valuation
$3,500.00
$0.00
$50.00 D Permit Voided I
Permit Fees
Plan Approval
Issued By
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s ~~o secure a e;es approvals before starting such activity.
Signature ~
Agent/Owner
BERLIN
WI 54923 - 0133 Telephone Number 920-361-1403
Address P.O. BOX 133
Parcelld #
Date 09/25/2006
Date
9- z~- ,16
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.