HomeMy WebLinkAbout2006-Plumbing (laterals)
G
OSHKOSH
ON THE WATER
Job Address 100170 WYLDEWOOD DR
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner HAVENWOOD HEIGHTS LLC
Contractor 4 WAY CONSTRUCTION
Category 430 - Industrial-Exterior (laterals)
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature 8" private water main for 3 new 16-units.
of Work
No
121698
Create Date 09/25/2006
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
#
Conn. Type
Size
Material
Type
Sanitary Sewer
Storm Sewer
Water Service
8"
Plastic
Main
New
Valuation
$3,500.00
$0.00
$50.00 D Permit Voided I
Plan Approval
Permit Fees
Issued By
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, t City strongly urges the permit applicant to contact the
easement holder(s) an cure any ne s apt- ro Is before starting such activity.
Signature
WI 54923 - 0133 Telephone Number 920-361-1403
Address P.O. BOX 133
BERLIN
Parcel Id #
0632100000
Date 09/25/2006
Date
9-'JS" -oS-
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.