Loading...
HomeMy WebLinkAbout2006-Plumbing (laterals) G OSHKOSH ON THE WATER Job Address 100170 WYLDEWOOD DR CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner HAVENWOOD HEIGHTS LLC Contractor 4 WAY CONSTRUCTION Category 430 - Industrial-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature 8" private water main for 3 new 16-units. of Work No 121698 Create Date 09/25/2006 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs # Conn. Type Size Material Type Sanitary Sewer Storm Sewer Water Service 8" Plastic Main New Valuation $3,500.00 $0.00 $50.00 D Permit Voided I Plan Approval Permit Fees Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, t City strongly urges the permit applicant to contact the easement holder(s) an cure any ne s apt- ro Is before starting such activity. Signature WI 54923 - 0133 Telephone Number 920-361-1403 Address P.O. BOX 133 BERLIN Parcel Id # 0632100000 Date 09/25/2006 Date 9-'JS" -oS- To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.