HomeMy WebLinkAbout0123630-Plumbing
o
OSHKOSH
ON THE WATER
Job Address 729 SIEWERT TRL
Contractor O'NEILL ENTERPRISES INC
PLUMBING PERMIT - APPLICATION AND RECORD
CITY OF OSHKOSH No 123630
Owner CITY OF OSHKOSH (PARKS) Create Date 02127/2007
Plan
Category 440 - Industrial-Interior
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain 4 Local Waste Ice Chest FlrlWst Sink
Lavatory 1 Lndry Tray Clothes Wshr Exam Sink Catch Basin
-
Toilet 1 Disposal Bidet Sculry Sink Wash Ftn
-
Res. Sink 1 Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc. 2 Hose bibb
Fixtures
Use/Nature Addition to city maintenance garage "debit acct
of Work
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Conn. Type
Material
Type
#
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$0.00 D Permit Voided I
$5,500.00 Plan Approval
$0.00 Permit Fees
Issued By
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W 6TH AVE
OSHKOSH
WI 54902 - 0000 Telephone Number 920-230-2007
Parcel Id #
Date 02127/2007
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.