Loading...
HomeMy WebLinkAbout0123628-Plumbing (water heater) G OSHKOSH ON THE WATER Job Address 2124-2130 W 9TH AVE Contractor SOPER PLUMBING CITY OF OSHKOSH No 123628 PLUMBING PERMIT - APPLICATION AND RECORD Owner THOMAS N RUSCH ET AL Create Date 02/27/2007 Category 441 - Industrial-Water Heaters Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature C-store/ Replace electric water heater. EIV Jim Johnson "debit acct per Jack of Work Shower Water Softner Wait. St. Shamp Sink Coffee Maker Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Disposal Bidet Sculry Sink Wash Ftn RPZ Valve - Dishwasher Beer Tap Hand Sink Urinal Eye WashStatn Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Ejector/Grind Drink Ftn Serv Sink Soda Disp Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0614760000 $25.00 0 Permit Voided I $600.00 Plan Approval $0.00 Permit Fees Valuation Issued By Date 02/27/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2225 BURNWOOD DR Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 426-2151 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.