Loading...
HomeMy WebLinkAboutHVAC U4-70-0706-H2 Revised ~ OJHKOfH City of Oshkosh Division of Inspection Services 215 Church Avenue PO Box 1 130 Oshkosh WI 54903-1 130 www.ci.oshkosh.wi.us ON THE WArER February 26, 2007 Joel Clary Summit Design LLC W6744 Rogersville Rd Fond du Lac, WI 54937 Ryan Meyers Oshkosh Truck 2307 Oregon St Oshkosh, WI 54903 Site: Plan Number: U4-70-0706-H2 Oshkosh Truck 2737 Harrison St Oshkosh WI 54901 For: Description: Revised HV ACfor 2nd floor remodel of office bldg Object Type: HV AC only Class of Construction: lIB - 8200 Sq Ft.; sprinklered Occupancy: B: Business I Office The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in Chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements Key Item(s) I Conditions: · NEC 110.26 Spaces About Electrical Equipment. Sufficient access and working space shall be provided and maintained about all electric equipment to permit ready and safe operation and maintenance of such equipment. Caution -on clearances around VA V 's installed above ceiling. · IMC 606.4.1 The duct smoke detectors shall be connected to a fire alarm system. The actuation of a smoke detector shall activate a visible and audible supervisory signal at a constantly attended location. · IECC 803.2.9 Piping insulation. All piping serving as part of a heating or cooling system shall be thermally insulated in accordance with Section 803.3.7/ Comm 63.1029. · Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve rules under this code and which are made to construction documents that have previously been granted approval by the department or its authorized representative, shall be submitted to the office that granted the approval. All revisions and modifications to plans shall be approved in writing by the department or its authorized representative prior to the work involved in the revision or modification being carried out. A revision or modification toa plan, drawing or specification shall be signed and sealed in accordance with Comm 61.31(1). hlm;pc:diol1s\Pbn Review\Cnmmerl'ial Plan Revi",w ::007\U4-70-0706-H2 2737Uarrison St H,'vi,ed HVAC Only.d()c Page 1 of2 · Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional shall file a compliance statement form SBD-9720 with this office. A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to be obtained prior to commencement of work. In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. Inquiries concerning this correspondence may be made to me at the number listed below or the address on this letterhead. ~ B=n Noe Building Systems Consultant (920) 236-5051 Monday- Friday 7:30 A.M. to 8:30 A.M and 12:30 A.M to 1:30 P.M. bnoe@ci.oshkosh.wLus cc: Property file Pee Required $ Fee Received $ Balance Due $ 150.00 150.00 0.00 l:\hbpectiUr!s\Plan Hevinv\Cornrnerc.ial nom Review 2(107\U4-7(l-(l706-H2 2737 IIarrison St l<kvi:::ed IIVAC Only.do<; Page 2 of2