HomeMy WebLinkAbout0123614-Building
e
OSHKOSH
ON THE WATER
Job Address 2737 HARRISON ST
CITY OF OSHKOSH No 123614
BUILDING PERMIT - APPLICATION AND RECORD
Owner OSHKOSH TRUCK CORP Create Date 02/23/2007
Designer
T - Karrels
Contractor
KOMOROWSKI DRYWALL LLC
Category
223 - Alteration Offices, Banks, Professional
Plan U4-70-0706-R
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Sq. Ft.
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature Office/ Alterations to 2nd floor as per plans to include steel studs, drywall, doors & frames, toilet partitions, ceiling tile, floor finishes.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuat
$80,000.00 Plan Approval
$0.00 Permit Fee Paid
$328.00 Park Dedication
$0.00
Issued By:
Date 02126/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1519600000
In the Performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an eas ment, the City strongly urges the permit applicant to contact the easement
holder(s) and to cur~ any ne ssary approval before starting such activity.
Address 3952 APPLE LN
Agent/Owner
OSHKOSH
Date 1-0/07
Signature
WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.