Loading...
HomeMy WebLinkAbout0123614-Building e OSHKOSH ON THE WATER Job Address 2737 HARRISON ST CITY OF OSHKOSH No 123614 BUILDING PERMIT - APPLICATION AND RECORD Owner OSHKOSH TRUCK CORP Create Date 02/23/2007 Designer T - Karrels Contractor KOMOROWSKI DRYWALL LLC Category 223 - Alteration Offices, Banks, Professional Plan U4-70-0706-R Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature Office/ Alterations to 2nd floor as per plans to include steel studs, drywall, doors & frames, toilet partitions, ceiling tile, floor finishes. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuat $80,000.00 Plan Approval $0.00 Permit Fee Paid $328.00 Park Dedication $0.00 Issued By: Date 02126/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1519600000 In the Performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an eas ment, the City strongly urges the permit applicant to contact the easement holder(s) and to cur~ any ne ssary approval before starting such activity. Address 3952 APPLE LN Agent/Owner OSHKOSH Date 1-0/07 Signature WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.