HomeMy WebLinkAbout0123579-Plumbing (remodel)
G
OSHKOSH
ON THE WATER
Job Address 300 S KOELLER ST
CITY OF OSHKOSH
PLUMBING PERMIT .. APPLICATION AND RECORD
Owner LANDMARK LIMITED PARTNERSHIP III
Contractor D.R. HANSEN PLBG.
Category 440- Industrial-Interior
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Water Softner Wait. St. Shamp Sink
Local Waste Ice Chest FlrlWst Sink
Clothes Wshr Exam Sink Catch Basin
Bidet Sculry Sink Wash Ftn
Beer Tap Hand Sink Urinal
Lab Sink Plaster Sink Standp Rec
Sterilizer Surgeons Sink Ice Maker
Dip Well F Prep Sink Gar Drain
Drink Ftn Serv Sink Soda Disp
2
2
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
No 123579
Create Date 02121/2007
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
"Eye Wash siain"
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Relocate two lavs, install drinking fountain and replace two toilets in unit 300-C. ***Debit Account
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0608770000
Valuation
$2,500.00
$0.00
$35.00 0 Permit Voided I
Plan Approval
Permit Fees
Issued By
Date 02/21/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 55 KNAPP ST
OSHKOSH
WI 54902 - 3448 Telephone Number 233-1595
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.