Loading...
HomeMy WebLinkAbout0123579-Plumbing (remodel) G OSHKOSH ON THE WATER Job Address 300 S KOELLER ST CITY OF OSHKOSH PLUMBING PERMIT .. APPLICATION AND RECORD Owner LANDMARK LIMITED PARTNERSHIP III Contractor D.R. HANSEN PLBG. Category 440- Industrial-Interior Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Water Softner Wait. St. Shamp Sink Local Waste Ice Chest FlrlWst Sink Clothes Wshr Exam Sink Catch Basin Bidet Sculry Sink Wash Ftn Beer Tap Hand Sink Urinal Lab Sink Plaster Sink Standp Rec Sterilizer Surgeons Sink Ice Maker Dip Well F Prep Sink Gar Drain Drink Ftn Serv Sink Soda Disp 2 2 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind No 123579 Create Date 02121/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve "Eye Wash siain" Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Relocate two lavs, install drinking fountain and replace two toilets in unit 300-C. ***Debit Account Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0608770000 Valuation $2,500.00 $0.00 $35.00 0 Permit Voided I Plan Approval Permit Fees Issued By Date 02/21/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 55 KNAPP ST OSHKOSH WI 54902 - 3448 Telephone Number 233-1595 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.