Loading...
HomeMy WebLinkAbout0123603-Plumbing (drink ftn) G OSHKOSH ON THE WATER Job Address 250 CITY CENTER CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner CITY CENTER ASSOCIATES LLC Contractor D.R. HANSEN PLBG. Category 440 - Industrial-Interior Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp No 123603 Create Date 01/16/2007 Plan W2-227-1206-P Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Drinking fountain added to work under permit #122986. Per COMM 82.20 changes to plans shall be submitted. 0 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0100600000 $0.00 Permit Fees $7.00 0 Permit Voided i Valuation $1 ,000.OLJ.lan Approval Issued By ~ Date 02/22/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 55 KNAPP ST AgenUOwner OSHKOSH WI 54902 - 3448 Telephone Number 233-1595 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.